Part 19 – Ivatt Engine Orders

The Maurice Boddy Collection

The early engine orders down to EO226 were recorded by the Locomotive Drawing Office in a retrospective EO book (started in 1901). Their accuracy has to be taken on trust, but they do leave some questions. Based on the best available information, the engines ordered around 1895-96 were as follows. Presumed dates in square-brackets. Amendments to the original order in curved brackets:

Engine Nos. Ivatt Class Date ordered EO No. Dome/domeless Date built Builder Remarks
1021-30 J9 5/1895 domeless 2-4/1896 Doncaster Stirling order
1031-45 J6 [1/1896] domeless 6-7/1896 Dubs  
1046-60 J14 1/1896 domeless 7/1896 Neilson  
1061-70 E1 [1/1896] (domeless) 2-5/1897 Doncaster amended to domed
1071-80 D2 25/1/1896 201 (domeless) 5-6/1897 Doncaster amended to domed
1081-90 J5 [1/1896] domeless 9-12/1896 Doncaster  
1091-1100 J5 mid-1896 (domeless) 12/1897-3/1898 Dubs amended to domed
111, 155 J14 [1896] 202 domeless 8/1897 Doncaster EO202 assumed
(1101-10) J13 18/8/1896 203 (domeless) 8-10/1897 Doncaster amended to domed
engines numbers altered
to 1201-10
(1111-15) J14 9/1896 domeless 6/1897 Neilson engine numbers altered
to 1211-15

In addition No. 400, the prototype 4-4-0 (built 12/1896) was ordered some time during 1896, and treated as a “replacement” (though the engine it replaced was a goods engine). It would appear that the EO system was started about May 1897, starting retrospectively with EO201 (order issued 1/1896, but at present under construction).

For details of Tender Orders see Part 26.

Engine Order Date issued GNR Class Engine Nos. Renewal or Capital Remarks
201 25/1/1896 D2 1071-80 R Screw coupling between engine and tender (though general Arrangement dwg. Q53 shows central coupling)
202 J14 111, 155 R No confirmation seen that
this is correct
203 18/8/1896 J13 (1101-10)

1201-10

R
Numbers altered
204 /1896 D2 1301-10 C Screw coupling between
engine and tender
205 18/1/1897 C2 1009/10/13-20 C  
206 12/5/1897 C1 990 C Central coupling between
engine and tender
207 13/5//1897 D2 1311-20 R Screw coupling between
engine and tender
208 13/5/1897 J5 315/16/18/29/31/32/34/36-38 R  
209 15/7/1897 D1 1321-25 C Central coupling between
engine and tender
210 21/12/1897 A4 266 R Central coupling between
engine and tender
211 6/1/1898 D1 1326-35 C Central coupling between
engine and tender
212 6/1/1898 C2 1501-10 C  
213 6/1/1898 D2 1341-45

1346-50

C

R

Screw coupling between engine and tender
214 13/8/1898 C2 1511-20 C  
215 5/1/1899 A5 267 R (coupling not mentioned, though no doubt Central)
216 5/1/1899 D1 1336-40, 1361-65 R Central coupling between engine and tender
217 5/1/1899 J5 343-45/48-53/59-64/67/68/71/75/81 R  
218 6/1/1899 C1 949/50/82-89 C  
219 22/2/1899 D2 1351-60 C  
220 26/10/1899 J5 165/77/79/80/92, 302-04/06/08, 384/86-88/90/92/94/96/98/99 R  
221 26/10/1899 D1 1366-75

1376-85

R

C

 
222 1/8/1900 A5 92, 100, 261-65/68-70 R  
223 6/4/1900 C2 1521-30 C  
224 24/11/1899 C1 271 R  
225 12/12/1899 J14 1046-48/50/51 Conversions to condensing retaining their old boilers
226 6/4/1900 K1 401 R  
227 1/8/1900 J13 1251-70 R  
228 /1900 J14 928/27/64/79, 1054 Conversions to condensing fitted with new boilers
229 29/6/1901 K1 402-11 R Use SO1093 for material
230 17/12/1901 C1 (251-60)

252-60/50

R Material for No. 251

transferred to EO232

Engine Order Date issued GNR Class Engine Nos. Renewal or Capital Remarks
231 7/1/1902 K1 412-21 R Use SO1116 for material
232 1/5/1902 C1 251 R  
SO1007 ? D1 1386-95 R Coupled axles, tyres, piston rods, cabs, splashers etc., but not the frames
233 28/10/1902 K1 (422-41)

422-40

R SO1169 for ironwork 441 deleted, see EO235
234 18/12/1902 C2 1531-40 R SO1008 for ironwork
235 6/2/1903 L1 116 R Material from EO233
236 18/5/1903 C1 272-91 R  
(237) 18/5/1903 (K1) (441-50) R Cancelled. See EO243
238 18/5/1903 L1 117-26 R SO3647 for ironwork
239 10/5/1904 C1 292 R  
240 22/9/1904 C1 293-99, 300/01, 1400 R  
241 7/12/1904 C1 1401-10 R  
242 19/12/1904 J13 1271-80 R  
243 19/12/1904 L1 127-36 R Material from EO237 “where possible”
244 20/4/1905 MR 1, 2 R Rail motors
245 9/8/1905 C1 1411-20 R  
246 9/8/1905 L1 137-56 R  
247 26/1/1906 K1 441-45 R  
248 7/5/1906 C1 1421 R  
249 6/9/1906 C1 1422-31 R  
250 22/11/1906 C2 1541-50 R  
251 4/1/1907 N1 190 R “2nd hand boiler to Works Order 10770”
252 6/3/1907 D1 1396-99, 1180 R Order probably cut down from 10 to 5 (-/1908)
253 6/3/1907 C1 1432-41 R  
254 5/6/1907 N1 1551-60 R  
255 21/10/1907 C1 1442-51 R  
256 30/1//1908 J21 1-15 R  
257 1/7//1908 J13 1281-90 R  
258 28/9/1908 D1 41-50 R  
259A

259B

27/1/1909 K1 446-50

451-55

R Saturated boilers

Superheated boilers

260 31/3/1909 J22 31-40 R  
261 14/9/1909 N1 1561-70 R  
262 9/12/1909 J22 21-30 R  
263 20/2/1910 C1 1452-61 R  
264 10/6/1910 N1 1571-80 R  
265 18/10/1910 D1 51-65 R  
266 5/4/1911 J22 521-35 R  
267 11/7/1911 N1 1581-95 R  
268 10/11/1911 N1 1596-99, 1600-05 R