Part 2 – Ivatt Boiler Orders (1896 – 1900)

The Maurice Boddy Collection

FINAL STIRLING DEVELOPMENT

With certain exceptions, Stirling’s largest boilers were only 4ft.-2in. or 4ft.-2½in. diameter.  However, his 174 Class 0-6-0 of 1872 (Ivatt J4) had 4ft.-5in. diameter boilers, with 11ft.-4in. long barrels and 6ft.-2in. firebox casings (Boiler drawing N36).  (The sort of boiler in fact which Stirling could have fitted to his single-wheelers had the close proximity of their driving wheels to the boiler not limited their maximum possible diameter to 4ft.-2in.).  The number of their tubes was reduced in 1892 (N61).  In 1879-80 he reboilered all ten Sturrock 270 Class 0-4-2WT (Ivatt F5), with 4ft.-5in. boilers (N40).  In 1879 he considered fitting 4ft.-5in. boilers (N42) to new 2-4-0s (Ivatt E2), but this was vetoed on the grounds of cost.  Then in 1886 he introduced 4ft.-5in. boilers (N55), as replacements for his 120 Class 0-4-4BT (Ivatt G2).  Finally, in 1895 the 1879 proposal (N42) was resurrected for his new 1021 Class 0-6-0 (Ivatt J9), though Ivatt soon produced his domed version (N77). The development is set out below.

Two weeks after Stirling’s death an order was placed with Neilson & Co. for fifteen 921 Series 0-6-0ST, Nos. 1046-60.

DRAWINGS FOR 4ft.-5in. DIAMETER BOILERS

Drawing No. Date Barrel + Firebox casing boiler tubes Drawing title
N36 1871 11′-4″ + 6′-2″
232 x 1¾”
Goods boiler. Cyls. 19″ x 28″
N40 1878 10′-0″ + 4′-6″
162 x 15/8
270 to 279
N42 8/1879 10′-2″ + 5′-6″
201 x 15/8
 6′-6″ passenger engines
N55 1886 9′-10″ + 4′-6″
201 x 15/8
4′-5″ boiler for Metro Bogie Tank Engines to
replace old boilers
N61 1892 11′-4″ + 6′-2″
207 x 1¾”
Boiler for goods engines
N65 15/1/1895 10′-1″ + 5′-6″
196 x 1¾”
Boiler for Goods Engines with 4′-6″ wheels
1021 to 1026
N71 18/2/1896 10-1″ + 5′-6″
215 x 1¾”
Boilers for 1081- 1090
N77 7/1896 10′-1″ + 5′-6″
215 x 1¾”
Standard boiler for Goods & Passenger Engines

The position at the time of Stirling’s death (11/1895) was as follows:

Class F5. Nos. 270-79 intact, but all were withdrawn 1898-1905.  In addition, it is possible that some (perhaps all) of the 241-50 series engines acquired 4ft.-5in. diameter boilers, but the official records showed conflicting evidence.  Nos. 241A-250A were withdrawn 1898-1906.

Class G2.  13 engines still unaltered.  Then No. 248 was dealt with (12/1895).  10 more were dealt with 1896-1901, leaving Nos. 652/55 unaltered.

Class J4 intact, but all six were withdrawn 1901-06.

Class J9. Nos. 1021-30 on order. These appeared 6-7/1896.

STIRLING – IVATT TRANSITION

At the time of Stirling’s death, Doncaster Works had a number of second-hand boilers available for re-use, with further new boilers on order.

Stirling fitted his 120 Class 0-4-4BT with larger diameter boilers (4ft.-5in. barrel diam., 9ft.-10in. barrel length, 4ft.-6in. firebox casing length) from 1886 onwards, leaving thirteen engines still to be dealt with. No. 245 was reboilered 12/1895, and meanwhile a further ten boilers had been ordered, which were fitted as follows. 

Engine No. Fitted   Engine No. Fitted
531 1/1896   625 2/1899
628 2/1896   247 5/1899
657 2/1896   622 6/1899
159 3/1896   249 6/1900
246 9/1897   250 6/1901

This left Nos. 652/55 unaltered, which eventually acquired Ivatt domed 4ft.-5in. boilers instead (see BO512).

A new boiler (4ft.-0½in. barrel diam, 10ft. barrel length, 4ft.-10in. firebox casing length) was fitted to non-standard 0-6-0ST No. 395 (fitted perhaps 2/1897 at Doncaster Carr).  This engine was the Carr Loco Pilot, by the time that the LDO was trying to sort out the boiler business in 1901.  Under the new numbering system its boiler eventually became No. 395.  After 9/1906 it served as a stationary boiler at the Carr Wagon shops (as SB223).

Stirling fitted Sturrock 251 Class 2-4-0 with larger boilers (4ft.-2½in. barrel diam., 10ft. barrel length, 5ft.-4in firebox casing length) in the late ’eighties and early ’nineties, the later ones no doubt being made from steel.  The last one to be fitted was No. 259 (2/1896).  Afterwards No. 258 acquired its second larger boiler (8/1899), which was second-hand previously fitted to No. 254.

Stirling also fitted Sturrock 270 Class 0-4-2WT with larger boilers (4ft.-5in. barrel diam., 10ft. barrel length, 4ft.-10in. firebox casing length) around the late ’seventies.  He then started replacing them with new steel boilers, No. 271 being the first (11/1894).  It is quite likely several replacement steel boilers were built, and some could have been fitted at unrecorded dates to the rather similar 241 Class.  Between these two classes the following acquired what were apparently new boilers: Nos. 278 (10/1897), 275 (3/1898), 247A (7/1900), 245A (2/1902).  No. 275’s boiler afterwards served (as SB252) at Muskham Pumping Station (1909-41), which is an interesting link to an engine built in 1867.

Of great significance about this time was the extended use of boilers removed from older engines, which had either been given replacement boilers or scrapped. This practice was introduced in 1896, when some Sturrock engines were withdrawn with serviceable boilers.  The following Sturrock 0-6-0’s acquired second-hand boilers.

Engine No. Boiler fitted Boiler from Boiler No. (a) Engine Withdrawn
362A 5/1900 444 1741 8/1908
407 8/1900 464 407 10/1902
359A 10/1900 425 1732 5/1903
332A 1/1901 318 1731 8/1905
329 10/1901 168 1725 1/1903
419 12/1901 453 453 8/1906
448 12/1901 458 458 10/1902
408 2/1902 447 447 7/1908
411 3/1902 411 448 6/1907
192A 10/1903 448 458 (boiler off 1/1907)
304A 11/1904 454 454 11/1909
425 12/1904 359A 1732 10/1906
192A 3/1907 427A 427 1/1909

(a) Numbers were allocated 2/1901, but boilers only physically numbered at their next Works visit.

IVATT’S INHERITANCE

In May 1895, the Works Manager at Doncaster, John Shotton, died followed by Patrick Stirling on 11th November 1895.  Douglas Earle Marsh (1862-1933), the new Works Manager & Assistant Locomotive Engineer, was appointed in December 1895, whilst the new Locomotive Engineer, Henry Alfred Ivatt (1851-1923), arrived at Doncaster 1st March 1896.  Meanwhile the Acting Locomotive Engineer was Matthew Stirling.  New drawings produced in the Locomotive Drawing Office (LDO) around this time included:

Dwg. No. Drawing Type Issue date Barrel Dia Marked up for
N65 Boiler 15/1/1895 4′-5″ Goods engines with 4′-6″ coupled wheels; 196 small tubes;

firebox grate area 16.22 sq ft; boiler pressure 160 psi

P36 General

Arrangement

15/1/1895 4′-5″ Goods engines Nos. 1021-26.

Drawing reissued 9/1896

N66 Boiler 11/1895 4′-2½” Goods engines with 5′-0″ coupled wheels
P37 General

Arrangement

11/1895 4′-2½” Goods engines to be numbered 1031-45
N71 Boiler 18/2/1896 4′-5″ Revised version of N65.  215 small tubes; firebox grate area 17.8 sq. ft.

(by reducing the width of the foundation ring from 3″ to 1¾”);

boiler pressure 170 psi.

N77 Boiler 7/1896 4′-5″ Domed version of N71.  2-ring barrel, instead of the 3 rings Stirling favoured

The larger boiler had been instigated by Stirling, and followed through by Ivatt.

Ivatt would have been appointed to succeed Stirling on the strength of his intended strategy in the Locomotive Department, and he would not have wanted to waste any time whilst “working his notice” with the Great Southern & Western Railway.  It seems likely that in January 1896 orders were placed for fifty new engines, 10 each Classes D2, E1, J5, J6, J14 (here using Ivatt’s later Engine Classification), presumably as proposed by Ivatt.  This gave the Locomotive Drawing Office a chance to start on the drawings, ready for when Ivatt took charge on 1st March, when he could then make certain alterations.  New features he instigated were narrow “water legs” to increase the firebox grate area, provision of washing out plugs high up the firebox sides giving access to the roof of the inner firebox for removing scale, steam to be collected from the boiler at its highest point, i.e. in a dome, with the regulator valve in the dome. 

Ivatt may also have provided drawings of current G.S.& W.R. 4-4-0s with 6ft.-7in. diameter coupled wheels, as the first G.N. 4-4-0 appeared within nine months of his arrival.  There was no reference to express passenger engines at this time.  Stirling had been having trouble with his latest 1003 Class 4-2-2, and Ivatt may have been content (for the moment) to improve their boilers, while he thought of a better solution which wouldn’t have a constraint on boiler diameter.

When Ivatt took over at Doncaster, no historical records were being kept, other than were essential for the smooth running of the company.  From the scant information available, though there is no absolute proof, the system seems to have been as follows:

ENGINE STOCK BOOKS covered all engines in Capital Stock, with basic data, such as engine number, type, date built, brief details of repairs in Works and important repairs at sheds, and finally date withdrawn. Details of engines built, renewed or repaired were recorded in numerical order, thus for example details for No. 100 were entered on page 100. After an engine was withdrawn a line would have been drawn across the page and if the engine number was reused then details of the new engine would be added below the line, commencing with the word “Rebuilt”. A separate book was required for Duplicate List engines which would be entered randomly,

WORKS REPAIRS BOOKS contained more detail, essential if at a later date there was a “post mortem” enquiry into a component failure. The repair details in the Stock Books were cross-referenced to entries in  these Repairs Books.  These Repairs Books covered the earlier years as follows:

Book Coverage   Book Coverage   Book Coverage
1 not known   5 1/1868-12/1870   9 1882-mid-1889
2 not known   6 1/1871-12/1874   10 mid 1889-mid 1892
3 not known   7 1/1875-mid 1879   11 mid 1892-1896
4 ?-12/1867   8 mid 1879-1881   12 1897-December 1898

The sole entry for a Stirling engine mentioned in Book 4 was No. 18, “Rebuilt” and ex-works 3/1/1868.  This engine was the first one built at Doncaster, and its works plate showed 1867 as its date.  (The next two engines built, Nos. 23 and 40, similarly showed 1867 on their works plates, but were in Book 5.)

Examples of boilers changed at Peterborough in 1889-90 are as follows.

  • No. 446 (13/5/1889),
  • No. 311 (15/7/1889),
  • No. 189 (22/7/1889),
  • No. 126 (6/8/1889),
  • No. 10 (10/2/1890).

From January 1899 onwards Reports of Doncaster repairs were recorded in a new system starting at 1/1, going to around 1/100, then starting at 2/1, and so on. For example the repairs to Ivatt 2-2-2 No. 92 in 1916 are cross-referenced to 200/6.  From January 1901 these Reports also included repairs undertaken at the sheds. The system continued until around Report 266/18 (June 1922) when either their recording in the Drawing Office Repairs Volumes simply ceased, or a new system had been introduced.  Further examples of new boilers fitted at sheds, were as follows:

  • No. 803 at Ardsley (21/5/1900),
  • No. 664 at Ardsley (12/6/1900),
  • No. 872 at King’s Cross (22/5/1901).

In addition there were probably record cards for individual engines which would be kept in engine order number. Until 1896 repair details for boilers were probably entered on the Engine Cards.  Thus information was held in the Works in both engine number order and repair date order.  Boiler record cards were introduced later, presumably some time between 1896 and 1901.

Accumulated mileages were being recorded for the life of each boiler (which prior to Ivatt arriving always stayed with the same engine throughout), so there could have been another simpler system running in parallel with mileage details for each engine (and thus boiler).  As an aside, lifetime mileages are recorded for example for Class F2 0-4-2: Nos. 40 (1,066,694) and 81 (1,010,494), which amounts to roughly 30,000 miles per annum, or about 80 miles per day, seven days a week.

ORDER NUMBERS – JANUARY 1897

For accountancy purposes, a new system of recording Engine Orders (EO), Stores Orders (SO), Tender Orders (TO) and Engine Repair Orders (ERO) was introduced about January 1897.  Current engine orders on the books were then numbered EO201 to EO204, boiler orders SO201 to SO206, and tender orders TO1 to TO4.  Earlier Engine and Boiler Orders whose construction had been completed needed no recognition, though there were some new boilers in stock that had not yet been allocated.  These were four domed boilers for Stirling single-wheelers (fitted between August 1897 and June 1899), and nine Ivatt domeless “standard” boilers for Stirling 0-6-0s (fitted between June 1898 and December 1899).  New boilers were either marked off to a specific EO, or (if built as replacements) to a specific ERO.

New Engine Orders from May 1897 were numbered from EO206 upwards, but new Boiler Orders started a new series from SO500, it having been realised there was confusion with EOs and SOs having similar numbers.

When the Locomotive Drawing Office (LDO) started recording details of Engine Orders in 1901 (see below) they left EO202 blank.  Presumably the clerk could find no trace of the order at that time, possibly because they could find no new boilers marked off to this Order, which there wouldn’t have been if the engines concerned had received spare boilers.  The most likely solution is that it was an Order to build two new 0-6-0 saddle tanks, Nos. 111 and 155, with spare Stirling boilers.  These engines appeared in August 1897, in the same month that the two Sturrock 0-6-0STs bearing these numbers were withdrawn.  Then SO524 (dated 6th May 1899) was specifically recorded as “B.O. 524”. 

There may have been some confusion in the LDO around this time, as it seems more likely that the Works would had introduced the BO system with BO500, or even with SO201 at the beginning of the system.  No corroboration has been seen, either way, and it is considered more convenient and less confusing from here on to use the term BO, apart from the SO exceptions mentioned next.

Stores Orders also covered miscellaneous material, not directly accountable to a specific engine, possibly including spare axles, axle boxes, wheel centres, piston rods, etc.  However, SO532 covered nine miscellaneous spare boilers.  SO1007 covered the construction of ten new 4-4-0s, Nos. 1386-95, making use of spare material (but not the frames).  SO2004 (12/1900) covered the completion of ten boilers from Kitson’s of Leeds.

BOILER NUMBERS – FEBRUARY 1901

For the boiler exchange system to work properly, it was necessary to keep track of all the boilers, yet for the time being they continued to remain unnumbered. It was not until around October 1900 that it was realised they had a problem.  The solution involved numbering boilers and keeping a continuous record of the engines to which they were fitted.

REPAIRS TO ENGINES VOLUMES – AUGUST 1901

  In August 1901 the REPAIRS TO ENGINES VOLUMES were started in the LDO.  Details of existing engines were entered in the books by a young clerk, Walter William Lake (1875-1958), with  details perhaps copied from the ENGINE STOCK BOOKS maintained in the Works (see earlier).  Lake’s instructions were simple, just copy details below the last line drawn across a page.  The current stock as at August 1901 was entered into 3 new volumes. Volume 1 covered Nos. 1 to 499 (with several blank pages), Volume 2 covered 500 to 1000 and Volume 3 covered 1001 upwards. Afterwards new engines, were entered in Volumes 1 or 2 as appropriate, if the page was blank, otherwise entered in Book 3,

Each entry following the last line drawn across a page was faithfully copied by Lake, including the word Rebuilt. Unfortunately many Stirling engines, mainly the early 4-2-2s (e.g. Nos. 1, 7, 8, 22, 34), had been given new frames and they too were described as Rebuilt, which was perhaps too strong a word.  At a later date someone crossed out “Rebuilt” in these Repairs Volumes and entered in pencil “New engine complete” instead.  But no attempt was made to insert the missing shopping dates.  Page 60 was blank after the line had been drawn across the earlier history and Lake probably asked what to do.  The answer was leave the page blank for future construction.  At the same time it was realised Lake had been writing the word Rebuilt and he was told from Page 61 to write “New engine complete” instead.

Presumably the Works continued maintaining their STOCK LISTS for their information, whilst the LDO maintained their new Repairs Volumes so as to keep track of the boilers.

RECORDING OF ENGINE, BOILER AND TENDER ORDER NUMBERS – AUGUST 1901

The LDO also started keeping their own copies of the Works Engine, Tender and Boiler Orders (but they did not retain the actual orders themselves).  With the boilers, the LDO copies commenced at Boiler Order 534 (issued 21st August 1900, executed 1901-02, see PART 4), which covered the first boilers to carry numbers when new, with the associated Engine Order 227 (issued 1st August 1900, see Appendix – E).  These records were subsequently kept up-to-date, practically to the end of steam.  Boiler numbers were recorded, and subsequent exchanges noted so that a close check could be kept of their allocations.  These books should have been reliable, or as reliable as a copy of a copy can be.

The LDO also prepared a retrospective Composite Engine/Tender/Boiler Orders book for earlier orders back to 1896.  In some cases the available information was rather sketchy and sometimes absent, so the book is neither complete nor accurate.  The various crossings out in the Boiler Order section show the difficulties encountered when looking at the renewals.  One page was allocated for each Boiler Order.  In one column was entered the boiler progress number within the order, e.g. 501/1 for the first boiler of BO501.  In column 2 were entered the numbers of the engines to which fitted that boiler was fitted (kept up-to-date to withdrawal), and in column 3 was entered its proposed (later actual) boiler number.  With replacement boilers, there was a difficulty working out which boiler went where.  They had been marked off to Engine Repair Orders, and these orders would then have to be located to work out to which engine they referred.  There were notes at the bottom of each page showing the various crossings out before the right answer was (hopefully) found.  The boiler number would be applied at its next shopping, and in most cases this was the same as the engine number in which the boiler was fitted on arrival in works. 

The Composite Order Book only covered engines/boilers/tenders built at Doncaster, so ignored the following contracted out engines: 1031-45 (1896), 1046-60 (1896), 1091-1135 (1897-99), 1136-1173 (1900-01), 1181-1200 (1899-1900), 1211-15 (1897).  It also ignored Nos. 111 and 155 built at Doncaster (1897).  Apart from the latter two engines, the new engines were numbered at the upper end of the stock list, so their boiler numbers would not be confusing.  Their subsequent boiler changes could be picked up anyway in the new REPAIRS TO ENGINES VOLUMES.  The only known oddity with the contract boilers concerns Neilson 0-6-0ST No. 1054 which was reboilered in October 1900, at the very start of the numbering scheme, and the clerk showed its new boiler as being allocated 1054.  However it seems to have gone out with an unnumbered boiler, which subsequently became number 67 when later fitted to No. 970.  The late Willie Yeadon wrote “special 67” against No. 1054 in his notes, so he clearly considered that the 1900-built boiler was the one was with this special number.

Details of the 1896 to mid-1901 orders that appeared in the retrospective Boiler Order book are as follows.

Unnumbered order. 3 domeless boilers for Stirling single-wheelers, which were fitted to Nos. 234 (1/1896), 773 (3/1896) and 874 (9/1896).  The original allocations for the first two of these boiler is interesting. No. 234 was the first 2-2-2 with a steel boiler (1886), whilst No. 773 was the first 4-2-2 with a steel boiler (1885).  However, the 2-2-2 and 4-2-2 boilers were strictly not interchangeable, as their firebox casing widths differed by 1in.  But a 4-2-2 boiler could be fitted to a 2-2-2 with special provision made for wider expansion brackets on the firebox sides.  It seems likely they were originally part of an order for ten boilers, which was curtailed after plates had been cut for the first three, and restarted again after fresh drawings had been made.  Specifically, these three boilers had 3-ring barrels, but the fresh drawings showed 2-ring barrels with a dome on the 2nd ring. See next order.

Unnumbered order. 7 domed boilers for Stirling 4-2-2 single-wheelers.  These were fitted to Nos. 93, 776, 544, 95, 34, 22 and 221 in 1896-99.  The date of the corresponding General Arrangement drawing (Q59) for domed 4-2-2 is not known.  However, the domed boiler drawings, N69 (firebox end) and N70 (smokebox end), were both dated “Feby /96”.  Hardly time for Ivatt (who arrived on 1st March 1896) to play much part in its original design, suggesting they were was drawn up with the sanction of the Acting Locomotive Engineer, Matthew Stirling.

The first engine altered was No. 93, in works 19th March to 18th June 1896.  It had a larger dome than the six later engines, and the working pressure was only 170 lb./sq. in.  The later boilers were set at 175 lb.  The fitting of this boiler required the frames to be lengthened, so it was not just a routine boiler change, and there were financial considerations to be sanctioned.  There could have been detail changes made after the drawings was first issued, right up to the point of the first boiler being used.  This could explain why the first boiler used was actually the second one of the batch.  The first boiler of the batch (in No. 776) probably had to have some alterations made after it had been completed.  As fitted to No. 93 the significant changes over the previous Stirling version were as follows.  Boiler barrel length 11ft.-3in. instead of 11ft.-5in., barrel made of two concentric rings instead of three, with a dome provided on the rear ring.  Firebox casing length 6ft.-8in. (though the revised general arrangement drawing Q59 shows 6ft.-9in.) instead of 6ft.-2in.  The throat plate sloped forward so that the overall horizontal length of the casing was 7ft., whilst its actual length measured on the slope was 7ft.-2in.  The length on the slope on the inner firebox was 6ft.-8¼in.  The width of the firebox foundation ring (the “water legs”) was 1¾in. instead of 3in,, thus increasing the area of the grate.  Washout plugs were provided high up on the sides of the firebox.  The first three boilers had their safety valves encased in Stirling-style brass covers, whilst the later engines had cast-iron covers, afterwards associated with Ivatt.  The General Arrangement drawing Q59 was revised January 1899, specifically for the last engine altered No. 221 which was laid up in shops throughout the first half of 1899, ex-works on 30 June 1899. 

Unnumbered order. At the beginning of 1896 a batch of 30 4ft.-5in. diameter domeless 3-ring boilers was on order: 10 for Class J9 Nos. 1021-30, 10 for Class J5 Nos. 1081-90, and ten spares for renewals for Classes J5 and J8. The order was too far advanced to be amended, once the barrel plates had been cut.  There was considerable delay in the fitting of the ten spares, as preference was meantime given to further new “standard boilers” (to drawing N77, dated July 1896) which had 2-ring barrels and domes.  The last of the spare domeless boilers was finally fitted (to No. 476) in December 1899.

Order 400E. 11 domed “standard” boilers, all still with the traditional brass safety valve casings. The first one was fitted to Ivatt’s first 4-4-0, Class D2 No. 400, followed by 10 for new Class E1 Nos. 1061-70.  On the same page of this retrospective boiler order book the clerk tagged on ten similar boilers built by Dubs for new Class J5 Nos. 1091-1100.  Their appearance on the same page as the earlier boilers may be nothing more than his desire to find somewhere to write down their numbers.  The page was headed 400E, presumably the identification used in connection with material for the 4-4-0, which seems to have been regarded for accountancy purposes as a Renewal.  However, the number 400 seems an unusual choice for a passenger engine, being in the goods engine number range.

All subsequent orders mentioned in this retrospective boiler order book had successive Boiler Order Nos. 201-06, 500-33, and these will be dealt with later.  But there were clearly other boilers either built or first used around this time, in particular as follows.

The last two Doncaster-built Stirling engines, 0-6-0ST Nos. 111 and 155 (became Ivatt Class J14) appeared in 1897, with boilers having 4ft.-0½in. barrel diam., 10ft.-6in. barrel length, 5ft.-6in. firebox casing length.  They were ostensibly replacements of older Sturrock engines, which in turn had also been “renewed” as 0-6-0ST in the 1860’s, then reboilered in 1881-82.  The source of the boilers for Nos. 111 and 155 is not known, but they were most likely spare boilers that had been originally ordered for general renewal purposes. It is possible these two replacements were charged to EO202, but the evidence was either absent or overlooked in 1901 when details were being sought (see earlier).

BOILER ORDER BOOK ENTRIES

As the main purpose of the recording was concerned with keeping track of future builds, the clerk saw no point wasting time tracking down obsolescent types, and the following were ignored:  Recent orders for Stirling boilers having 4ft-2½in diameter barrels (all classes), 4ft.-2in. boilers for the early 2-2-2s (Ivatt Class B5) and 4ft.-0½in. boilers for Classes J11, J15.  No 4ft.-2½in. boilers were subsequently ordered.  The 4ft.-5in. boilers for Class G2 were also ignored, though similar size boilers, however with domes, were ordered later by Ivatt.  The 4ft.-0½in. boilers continued to be ordered down to August 1911, then no more under Gresley.  In total there would be about sixty-six boilers ignored, probably ordered before Ivatt took over, and some would have been given low priority.  In particular, Ivatt’s policy was to replace the 4ft.-2½in. boilers with 4ft.-5in. boilers.  The various engines that received new boilers between 1896 and 1900, unaccounted for in the Drawing Office boiler order books, were as follows:

Engine Class Engine Nos
A2 664** (8/1896)
B5 39 (5/1897), 55 (10/1898), 63 (4/1897), 215 (2/1896)
E2 206 (7/1897), 209 (6/1898), 216 (4/1897), 263* (4/1900), 700 (10/1898), 703 (1/1897),
704 (1/1897), 706 (9/1897), 757 (7/1896)
E3 281 (1/1896), 286 (3/1899), 297 (7/1897), 299 (2/1896), 754 (9/1896)
F2 13 (3/1897), 16 (4/1898), 19 (11/1899), 65 (10/1897), 76 (6/1899), 77 (6/1898), 106 (1/1898),
243 (11/1900), 539 (4/1899)
F5 275 (5/1898), 278 (10/1897)
G2 246 (9/1897), 247 (5/1899), 504 (12/1899), 505 (3/1901), 531 (1/1896), 622 (6/1899),
625 (2/1899), 628 (2/1896), 657 (2/1896)
J2 305 (3/1896), 401* (5/1898), 418* (8/1898)
J6 101 (10/1897), 307 (2/1898), 310 (2/1896), 327 (6/1899), 644 (4/1898), 647 (4/1898), 649 (3/1898),
651 (4/1898), 718 (2/1898), 728 (6/1897)
J7 152 (9/1898), 477 (5/1896), 481 (4/1898), 482 (7/1896), 483 (8/1898)
J10 185 (11/1896), 189 (10/1896)
J15 617 (11/1896), 618 (5/1896), 674 (11/1896), 680 (10/1896), 783 (10/1896), 787 (11/1896),
805 (12/1896), 808 (12/1896)

* Engines 263, 401, 418 afterwards transferred to Duplicate Stock
** No. 664’s 1896 boiler may have been ignored as this had been changed at Ardsley shed (6/1900) for a new boiler.  The 1896 boiler, after repairs, was the one fitted to No. 1 (9/1900), recorded at the time as being ex-664.

Orders in the retrospective Boiler Order Book will now be listed in the Table below, and then dealt with individually in more detail later.  Dates of issue were recorded for BO’s 500, 502-33, but the absence of dates for the others may simply be because the clerk did not bother to write them down.  For ease of cross-reference, the Engine Classes in the following table are according to the later 1900 Ivatt Classifications.  A hyphenated Ivatt Class (e.g. J17 – J16) denotes the engine classification changed as the result of the boiler change.

BO BO date EO Ivatt Class Engine Nos. Remarks
A2, B3 various 234, 773, 874 (domeless)
A3 various 776, 93, 544, 95, 34, 22, 221 (domes)
J9
J5
J6 – J5
J8
1021-30
1081-90
various
various


743, 737, 796, 724, 748, 328, 321, 848
485, 476
 400E D2
E1
J5
400
1061-70
1091-1100


built by Dubs
201 201. D2 1071-80  
 

202


208.

J17 – J16

J5

606

(9) new

1 rebuild, followed by:
315/16/18/29/31/32/34/36/37
203 203. J12 1201-10  
204 B4 (5) various 876, 240, 873, 871, 233
205 J15 (5) various 601, 500, 688, 620, 858
206 204. D2 1301-10  
500 19/5/1897 205.

207.

C2

D2

B5 – B7

E2- E1

G3 –  G4

 J5

J17 –  J16

1009/10/13-20
1311-20(3) various(4) various(1) various338(1) various
new

new

 21, 41, 61

 89, 212, 702, 867

 763

new

 610

501 F7, G5 (2) various 629, 632
502 13/4/1897 206. C1 990  
503 19/5/1897 213 E1

D2

224

1341-49

 
504 19/5/1897 A stationary boiler for Carr New Wagon Shop,
barrel 4′-7in x 11′-0″
505 15/7/1897 209. D1 1321-25  
506 15/7/1897 210 A4 266  
507 10/11/1897 A2 (3) various 771, 69, 94
508 13/12/1897 211 D1 1326-35  
509 16/12/1897 212 C2 1501-10  
510 17/12/1897 J15 (10) various 790, 636, 859, 693, 782, 472, 635, 803, 860, 637
511 6/1/1898 213

D2

E1, E4

1350

(9) various

866, 760, 286, 540, 707, 715, 752, 819, 894

512 30/3/1898 F6, G2 (10) various 248, 652, 117A, 132, 655, 118, 242, 116, 624, 122
513 12/5/1898 J11

 J17 (a)

(4) various 124, 167

 611, 613 (a)

514 12/7/1898 A2 (6) various 548, 7, 670, 778, 664, 2

(a) J17 added later

BO BO date EO Ivatt Class Engine Nos. Remarks
515 6/1/1899 215 A5 267  
516 8/11/1898 214 C2 1511-20  
517 4/11/1898 219 D2 1351-60  
518 4/11/1898 217 J5 (10) new 343-45/48-53/59-64/67/68/71/75/81
519 5/1/1899 216 D1 1336-40, 1361-65  
520 5/1/1899 218 C1 949/50/82-89 3″ wide foundation ring instead of 1¾”

(521)

19/1/1899 C1 (10) cancelled probably intended for more Class C1
522 27/4/1899 B4 (5) various 877, 872, 236, 880, 235
523 27/4/1899 228 J14 928/27/64/79, 1054 conversions to condensing with new boilers
524 6/5/1899 E1, F3, G4 (10) various 764, 756, 25, 719, 759, 357, 683, 263,
99, 542
525 8/1899 F7, G5 (2) various 630, 502
526 26/10/1899 221 D1 1366-85 No. 1381 had 170 x 2″ diam, iron tubes
remainder had 238 x 1¾” diam, copper tubes
527 26/10/1899 220 J5 (20) new 165/77/79/80/92, 302-04/06/08,
384/86-88/90/92/94/96/98/99
528 6/4/1900 222 A5 92, 100, 261-65/68-70  
529 6/4/1900 223 C2 1521-30  
530 21/2/1901 224 C1 271 3″ wide “water legs” instead of 1¾”
225 J14 1048/50/46/47/51 conversions to condensing with their old boilers
531 6/4/1900 226 K1 401 3″ wide “water legs” instead of 1¾”
532 20/6/1900 E1, F3, G4, J5 (20) various See later for numbers
533 24/7/1900 6 vertical stationary boilers, 6′-10½” x 3′-6″, sent to
 Crimpsall Mess Room, Boston, Peterborough, Doncaster Bath
 & Office, Aslockton, Pinxton (last boiler said to have been
“built Partington”)

Thus the basis for checking the whereabouts of a particular boiler had a shaky start due to the lost years of recording during 1896-1901.  Further discrepancies subsequently came to light.  Furthermore, as already mentioned, no interest was as yet being taken of boilers fitted to engines on the Duplicate List.

Before covering in more detail these earlier Boiler Orders, which were entered up retrospectively around August 1901, the following orders for domeless boilers need to be mentioned, as they did not appear in any order book.

Builder Engine No. Ivatt Class Date Final Boiler No.
Dubs 1031 J6 6/1896 1031
1032 J6 6/1896 1032
1033 J6 6/1896 1033
1034 J6 6/1896 1034
1035 J6 6/1896 1035
1036 J6 6/1896 1036
1037 J6 6/1896 1037
1038 J6 6/1896 1038
1039 J6 7/1896 1039
1040 J6 7/1896 1040
1041 J6 7/1896 1041
1042 J6 7/1896 1042
1043 J6 7/1896 1043
1044 J6 7/1896 1044
1045 J6 7/1896 1045
Neilson 1046 J14 7/1897 1046
1047 J14 7/1896 1047
1048 J14 7/1896 1048
1049 J14 7/1896 1049
1050 J14 7/1896 1050
1051 J14 7/1896 1051
1052 J14 7/1896 1052
1053 J14 7/1896 1053
1054 J14 7/1896 67
1055 J14 7/1896 1055
1056 J14 7/1896 1056
1057 J14 7/1896 1057
1058 J14 7/1896 1058
1059 J14 7/1896 1059
1060 J14 7/1896 1060
1211 J14 6/1897 1211
1212 J14 6/1897 1212
1213 J14 6/1897 1213
1214 J14 6/1897 1214
1215 J14 6/1897 1215
Doncaster 111 J14 8/1897 111
155 J14 8/1897 155

In addition, further contractor–built engines, this time with domed boilers, appeared in 1898-1901.  Briefly these were:

Contractor Engine Nos. Ivatt Class Date Final Boiler Nos.
Dubs 1101-02 J5 1898 Same as engine
1103-35 J5 1899
Kitson 1136-60 J5 1900
Dubs 1163-73 J5 1901

The orders that were mentioned in the retrospective order book (which it will now be appreciated is not comprehensive) were as follows.  The number in the first column is as shown in the boiler book, and is presumably intended to be its progress number within the order.

BO-. 3 domeless boilers for single-wheelers, 4ft.-2in. barrel diam., 11ft.-5in. barrel length, 3-ring barrels, 6ft.-2in. firebox casing length.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 234 B3 1/1896 234
2 773 A2 3/1896 773
3 874 B4 9/1896 874

BO-. 7 domed boilers for single-wheelers, 4ft.-2in. barrel diam., 11ft.-3in. barrel length, 2-ring barrels, 6ft.-8in. firebox casing length.

Boiler No. Engine No. Ivatt Class Date Safety valves Final Boiler No.
1 776 A3 7/1896 Stirling 773
2 93 A3 6/1896 Stirling 93
3 544 A3 5/1897 Stirling 544
4 95 A3 8/1897 Ivatt 95
5 34 A3 12/1897 Ivatt 34
6 22 A3 1/1898 Ivatt 22
7 221 A3 6/1899 Ivatt 221

BO-. 30 domeless boilers ordered in 3 distinct batches.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1021 J9 2/1896 1021
2 1022 J9 2/1896 1022
3 1023 J9 2/1896 1023
4 1024 J9 2/1896 1024
5 1025 J9 2/1896 1025
6 1026 J9 3/1896 1026
7 1027 J9 3/1896 1027
8 1028 J9 3/1896 1028
9 1029 J9 3/1896 1029
10 1030 J9 4/1896 1030
11 1081 J5 9/1896 1081
12 1082 J5 10/1896 1082
13 1083 J5 10/1896 1083
14 1084 J5 10/1896 1084
15 1085 J5 10/1896 1085
16 1086 J5 11/1896 1086
17 1087 J5 11/1896 1087
18 1088 J5 11/1896 1088
19 1089 J5 11/1896 1089
20 1090 J5 12/1896 1090
21 743 J6 – J5 5/1897 743
22 737 J6 – J5 6/1898 737
23 796 J6 – J5 6/1898 796
24 724 J6 – J5 7/1898 724
25 748 J6 – J5 10/1898 748
26 485 J7 – J8 2/1899 485
27 328 J6 – J5 3/1899 328
28 321 J6 – J5 10/1899 321
29 848 J6 – J5 10/1899 848
30 476 J7 – J8 12/1899 476

BO “400E”. 11 boilers from Doncaster in two batches, with 10 Dubs boilers added.

BoilerNo. Engine No. Ivatt Class Date Final Boiler No.
1 400 D2 12/1896 400
2 1061 E1 2/1897 1061
3 1062 E1 3/1897 1062
4 1063 E1 3/1897 1063
5 1064 E1 3/1897 1064
6 1065 E1 3/1897 1065
7 1066 E1 4/1897 1066
8 1067 E1 4/1897 1067
9 1068 E1 4/1897 1068
10 1069 E1 4/1897 1069
11 1070 E1 4/1897 1070
1091 J5 12/1897 1091
1092 J5 12/1897 1092
1093 J5 12/1897 1093
1094 J5 1/1898 1094
1095 J5 2/1898 1095
1096 J5 2/1898 1096
1097 J5 2/1898 1097
1098 J5 2/1898 1098
1099 J5 2/1898 1099
1100 J5 3/1898 1100

BO201. 10 boilers for EO201 (issued 25/1/1896).

BoilerNo. Engine No. Ivatt Class Date Final Boiler No.
1 1071 D2 5/1897 1071
2 1072 D2 5/1897 1072
3 1073 D2 6/1897 1073
4 1074 D2 6/1897 1074
5 1075 D2 6/1897 1075
6 1076 D2 6/1897 1076
7 1077 D2 6/1897 1077
8 1078 D2 6/1897 1078
9 1079 D2 6/1897 1079
10 1080 D2 6/1897 1080

The boilers were intended to have the traditional Stirling brass safety valve casing, whilst for the next boiler order Ivatt cast-iron casings were to be fitted. However the safety valve casings of boilers 201/10 and 202/2 were switched, so that No. No. 1080 was the first engine with the new style casing.

BO202. 10 boilers almost certainly intended for EO205 (issued 18/1/1897), new 4-4-2T Nos. 1009/10/13-20. In the event, these engines received the first 10 boilers of BO500. Instead, the first boiler was used to rebuild an 0-6-0ST. A year or so later the remaining nine boilers were taken for (part) EO208 (issued 13/5/1897). The last engine of EO208 took the 23rd boiler of BO500.

<tbody/thead

Boiler No. Engine No. Ivatt Class Date Final Boiler No. Remarks
1 606 J17 – J16 7/1897 606  
2 315 J5 8/1898 315 New engine
3 316 J5 8/1898 316 New engine
4 318 J5 8/1898 318 New engine
5 329 J5 8/1898 329 New engine
6 331 J5 9/1898 331 New engine
7 332 J5 8/1898 332 New engine
8 334 J5 8/1898 334 New engine
9 336 J5 9/1898 336 New engine
10 337 J5 9/1898 337 New engine

BO203. 10 boilers for EO203 (issued 18/8/1896).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1201 J13 3/1897 1201
2 1202 J13 3/1897 1202
3 1203 J13 9/1897 1203
4 1204 J13 9/1897 1204
5 1205 J13 9/1897 1205
6 1206 J13 10/1897 1206
7 1207 J13 10/1897 1207
8 1208 J13 10/1897 1208
9 1209 J13 10/1897 1209
10 1210 J13 10/1897 1210

BO204. 5 boilers for renewals. There was a controversy over their initial allocation, and the numbers shown in the Boiler order book are given in Column 2.

Boiler No. Engine No. in Boiler Order Book Actual Engine No. Ivatt Class Date Final Boiler No.
1 876 876 B3 – B4 3/1899 876
2 240 240 B3 – B4 7/1898 240
3 873 873 B3 – B4 4/1898 873
4 **237 871 B3 – B4 8/1899 871
5 233 233 B3 – B4 9/1899 233

** at some date, 237 was crossed out and replaced by 871. No. 237 was not altered to B4 until 1910 (see BO522 later).

BO205. 5 domeless boilers for renewals.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 601 J15 5/1897 601
2 500 J15 8/1897 500
3 688 J15 7/1897 688
4 620 J15 10/1897 620
5 858 J15 12/1897 858

BO206. 10 boilers for EO204 (issued 1896).

 Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1301 D2 10/1897 1301
2 1302 D2 10/1897 1302
3 1303 D2 11/1897 1303
4 1304 D2 11/1897 1304
5 1305 D2 11/1897 1305
6 1306 D2 11/1897 1306
7 1307 D2 11/1897 1307
8 1308 D2 12/1897 1308
9 1309 D2 12/1897 1309
10 1310 D2 12/1897 1310

BO500 (19/5/1897) 30 boilers were ordered.  They were shown as “available for 6′-6″ H or S”. This is a rare example of the use of these codes in the LDO, which codes were published by Geo. Fredk. Bird in his “The Locomotives of the Great Northern Railway” (1902).  The boilers appeared in three distinct batches, which virtually meant they were not interchangeable.  The expansion brackets at the sides of the fireboxes were positioned 2ft.-1½in., 2ft.-7¼in. and 2ft.-11½in. below the barrel centre line, respectively for new Class C2 4-4-2T (EO205, issued 18/1/1897), new Class D2 4-4-0 (EO207, issued May 1897 [either 12th or 13th, the top corner of the page had been torn off]), and finally almost certainly new Class J5 0-6-0 (EO208, issued 13/5/1897).  To speed up delivery of the last EO, 9 boilers were taken from BO202. (with expansion brackets already marked off for this class), so that boilers 500/21, 500/22, and 500/24 to 500/30 were used instead for renewals, though it should be noted that many of the renewals still appeared before the new engines.  The best laid plans often go astray.

Boiler No. Engine No. Ivatt Class Date Final Boiler No. Remarks
1 1009 C2 2/1898 1009  
2 1010 C2 2/1898 1010  
3 1013 C2 5/1898 1013  
4 1014 C2 3/1898 1014  
5 1015 C2 10/1898 1015  
6 1016 C2 10/1898 1016  
7 1017 C2 10/1898 1017  
8 1018 C2 12/1898 1018  
9 1019 C2 12/1898 1019  
10 1020 C2 2/1899 1020  
11 1311 D2 3/1898 1311  
12 1312 D2 3/1898 1312  
13 1313 D2 4/1898 1313  
14 1314 D2 5/1898 1314  
15 1315 D2 4/1898 1315  
16 1316 D2 4/1898 1316  
17 1317 D2 5/1898 1317  
18 1318 D2 5/1898 1318  
19 1319 D2 6/1898 1319  
20 1320 D2 6/1898 1320  
21 21 B5 – B7 10/1897 21  
22 610 J17 – J16 9/1897 610  
23 338 J5 10/1898 338 New engine
24 212 E2 – E1 2/1899 212  
25 867 E2 – E1 5/1898 867  
26 41 B5 – B7 3/1898 41  
27 61 B5 – B7 4/1898 61  
28 89 E2 – E1 3/1898 89  
29 763 G3 – G4 7/1898 763  
30 702 E2 – E1 3/1898 702  

BO501.  2 domeless boilers for renewals for 0-4-4T and 0-4-2T.  There was a confliction over the barrel length of the first boiler (501/1}, with the order book showing 9ft.-3in., but the allocation book showing 9ft.  I made a note (28/2/1968) that I had spotted a classification chart with the length 9ft.amended in red ink to 9ft.-3in.

Boiler No. EngineNo. Ivatt Class Date Final Boiler No,.
1 629 G5 6/1898 629
2 632 F7 5/1897 632

BO502 (13/4/1897).  1 boiler for new Class C1 (EO206, issued 12/5/1897).

 Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 990 C1 5/1898 990

BO503 (19/5/1897).  10 boilers, original intention unknown.  They were ultimately allotted to new Class D2 (EO213 issued 6/1/1898), though subsequently the first boiler (503/1) was used as a renewal, and in due course the last engine of the order (1350) took a renewal boiler (511/1) out of BO511.

 Boiler No. Engine No. Ivatt Class Date Final Boiler No. Remarks
1 224 E2 – E1 10/1898 224  
2 1341 D2 12/1898 1341 New engine
3 1342 D2 11/1898 1342 New engine
4 1343 D2 12/1898 1343 New engine
5 1344 D2 12/1898 1344 New engine
6 1345 D2 12/1898 1345 New engine
7 1346 D2 12/1898 1346 New engine
8 1347 D2 12/1898 1347 New engine
9 1348 D2 12/1898 1348 New engine
10 1349 D2 12/1898 1349 New engine

BO504 (19/5/1897).  1 stationary boiler for Carr New Wagon Shop (shown as 4ft.-7in. x 11ft., working at 90 lb. psi).  It is not clear whether the barrel diameter or firebox length was 4ft.-7in.

BO505 (15/7/1897).  5 boilers for new Class D1 4-4-0 (EO209, issued same day).

 Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1321 D1 6/1898 1321
2 1322 D1 6/1898 1322
3 1323 D1 6/1898 1323
4 1324 D1 6/1898 1324
5 1325 D1 7/1898 1325

BO506 (15/7/1897).  1 boiler for new Class A4 4-2-2 (EO210, issued 21/2/1897).

 Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 266 A4 10/1898 266

BO507 (10/11/1907).  3 domeless boilers for renewals.

 Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 771 ** A2 7/1898 771
2 69 A2 6/1898 69
3 94 A2 5/1898 94

** This boiler was later fitted to 2-2-2 No. 234 (8/1904), the only example of a 4-2-2 boiler being afterwards carried by a 2-2-2.

BO508 (13/12/1897).  10 boilers for new Class D1 4-4-0 (EO211, issued 1/1898).

 Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1326 D1 10/1898 1326
2 1327 D1 10/1898 1327
3 1328 D1 10/1898 1328
4 1329 D1 11/1898 1329
5 1330 D1 11/1898 1330
6 1331 D1 11/1898 1331
7 1332 D1 11/1898 1332
8 1333 D1 11/1898 1333
9 1334 D1 11/1898 1334
10 1335 D1 11/1898 1335

BO509 (16/12/1897) 10 boilers for new Class C2 4-4-2T (EO212, issued 6/1/1898).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1501 C2 2/1899 1501
2 1502 C2 3/1899 1502
3 1503 C2 3/1899 1503
4 1504 C2 3/1899 1504
5 1505 C2 4/1899 1505
6 1506 C2 4/1899 1506
7 1507 C2 4/1899 1507
8 1508 C2 4/1899 1508
9 1509 C2 5/1899 1509
10 1510 C2 5/1899 1510

BO510 (17/12/1897).  10 domeless boilers for renewals.  There is a discrepancy in the allocation shown in the boiler order book (see column 2 below).

Boiler No. Engine No. in Boiler Order Book Actual Engine No. Ivatt Class Date Final Boiler No.
1 700 790 J15 4/1899 790
2 636 636 J15 8/1898 636
3 859 859 J15 6/1898 859
4 693 693 J15 6/1898 693
5 782 782 J15 4/1899 782
6 472 472 J15 5/1899 472
7 635 635 J15 6/1899 635
8 803 803 J15 4/1900 803
9 **473 860 J15 8/1900 860
10 ***616 ***637 J15 3/1901 637

** No. 473 was shopped in 1899 (no boiler change) and not shopped again until 1903.

*** 616 was crossed out and altered to read 637.

BO511 (6/1/1898). 10 boilers for renewals, but the first boiler (511/1} was taken for the last engine of EO213 (see BO503 earlier).

Boiler No. Engine No. Ivatt Class Date Final Boiler No. Remarks
1 1350 D2 12/1898 1350 New engine
2 866 E2 – E1 2/1899 866  
3 760 E2 – E1 8/1899 760  
4 286 E3 – E4 2/1899 286 Avonside
1868 engine
5 540 E2 – E1 5/1899 540  
6 707 E2 – E1 7/1899 707  
7 715 E2 – E1 8/1899 715  
8 752 E2 – E1 4/1899 752  
9 819 E2 – E1 10/1899 819  
10 894 E2 – E1 10/1899 894  

BO512 (30/3/1898) 10 boilers for renewals.  At the time this retrospective order book was being compiled, only 512/6 and 512/10 and been fitted.  Two, 512/4 and 512/8, were spare, with the remainder (apparently) not yet assembled.  When 512/2 was completed and fitted to No.  654 it was given the “special number 254”, which was a boiler number not otherwise allocated.  The remaining boilers when finally used were given the next available numbers in the main list.  A note was made (dated April 1908) that 512/1, 512/7 and 512/9 were in stock, so evidently they were not always assembled to order, but could hang around unused for several years, and certainly for at least 5 years as in the case of 512/7.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 248 G2 12/1912 7192
2 652 G2 9/1905 254
3 117A F4 – F6 2/1907 6822
4 132 F4 – F6 12/1904 1757
5 655 G2 2/1907 6823
6 118 F4 – F6 10/1899 118
7 242 G2 3/1913 7193
8 116 F4 – F6 6/1902 1714
9 624 G2 12/1909 7005
10 122 F4 – F6 10/1900 122

BO513 (12/5/1898).  4 domeless boilers for renewals, with 4ft.-10in. firebox casing length for Class J11. Only two built initially, the last two much later with 4ft.-6in. firebox casing length for Class J17.  

Boiler No. Engine No. in Boiler Order Book Actual Engine Nos. Ivatt Class Dates Final Boiler No.
1 124 124 J11 2/1899-11/1905 124
2 167 167 J11 5/1899-6/1904 167
3 611 611 J17 2/1908-1/1928 6876
4 613 613 J17 9/1910-11/1925 7031

BO514 (12/7/1898).  6 domeless boilers for renewals.  There were slight discrepancies in the boiler allocations shown in the order book (see column 2 below).

Boiler No. Engine No. in Boiler Order Book Actual Engine No. Ivatt Class Date Final Boiler No.
1 548 548 A2 3/1899 548
2 7 7 A2 6/1899 7
3 670 670 A2 7/1899 670
4 **98 778 A2 8/1900 778 ****
5 ***549 664 A2 9/1900 664
6 2 A2 12/1900 2

** 98 crossed out (engine withdrawn 5/1900) and replaced by 778.

*** 549 crossed out and replaced by 164, crossed out replaced by 664.

**** Boiler 778 was fitted to Stirling No. 1 (5/1925)

 

BO515 (6/1/1899).  1 boiler for new Class A5 4-2-2 (EO215, issued previous day 5/1/1899).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 267 A5 5/1900 267

BO516 (8/11/1898).  10 boilers for new Class C2 4-4-2T (EO214, issued 13/8/1898).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1511 C2 8/1899 1511
2 1512 C2 8/1899 1512
3 1513 C2 8/1899 1513
4 1514 C2 9/1899 1514
5 1515 C2 10/1899 1515
6 1516 C2 10/1899 1516
7 1517 C2 10/1899 1517
8 1518 C2 10/1899 1518
9 1519 C2 11/1899 1519
10 1520 C2 11/1899 1520

BO517 (4/11/1898).  10 boilers for new Class D2 4-4-0 (EO219, issued 22/2/1899).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1351 D2 11/1899 1351
2 1352 D2 11/1899 1352
3 1353 D2 11/1899 1353
4 1354 D2 12/1899 1354
5 1355 D2 12/1899 1355
6 1356 D2 12/1899 1356
7 1357 D2 12/1999 1357
8 1358 D2 12/1899 1358
9 1359 D2 12/1899 1359
10 1360 D2 12/1899 1360

BO518 (4/11/1898).  20 boilers for new Class J5 0-6-0 (EO217, issued 5/1/1899).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 343 J5 7/1899 343
2 344 J5 7/1899 344
3 345 J5 7/1899 345
4 348 J5 7/1899 348
5 349 J5 7/1899 349
6 350 J5 7/1899 350
7 351 J5 7/1899 351
8 352 J5 7/1899 352
9 353 J5 7/1899 353
10 359 J5 7/1899 359
11 360 J5 7/1899 360
12 361 J5 6/1899 361
13 362 J5 6/1899 362
14 363 J5 8/1899 363
15 364 J5 8/1899 364
16 367 J5 8/1899 367
17 368 J5 9/1899 368
18 371 J5 8/1899 371
19 375 J5 9/1899 375
20 381 J5 9/1899 381

BO519 (5/1/1899).  10 boilers for new Class D1 4-4-0 (EO216, issued same day 5/1/1899).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1336 D1 9/1899 1336
2 1337 D1 10/1899 1337
3 1338 D1 10/1899 1338
4 1339 D1 10/1899 1339
5 1340 D1 10/1899 1340
6 1361 D1 11/1899 1361
7 1362 D1 10/1899 1362
8 1363 D1 10/1899 1363
9 1364 D1 11/1899 1364
10 1365 D1 11/1899 1365

BO520 (5/1/1899).  10 boilers for new Class C1 4-4-2 (EO218, issued next day 6/1/1899).  Three of these boilers (989/86/83) were latterly fitted to LNER Classes Q1 and Q2 Nos. 3417 (3/1924), 3418 (8/1924), 3435 (5/1925), for which they would need to have had new shallow firebox casings fitted.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 949 C1 3/1900 949
2 950 C1 4/1900 950
3 982 C1 4/1900 982
4 983 C1 5/1900 983
5 984 C1 6/1900 984
6 985 C1 6/1900 985
7 986 C1 5/1900 986
8 987 C1 5/1900 987
9 988 C1 6/1900 988
10 989 C1 6/1900 989

BO521 (19/1/1899).  10 boilers (for new Class C1 4-4-2, possibly in anticipation of a forthcoming order).  The BO was then cancelled, and in due course replaced by BO544.

BO522 (27/4/1899).  5 boilers for renewals.  At the time this retrospective order book was being compiled (August 1901), only 522/2 had been fitted.  Presumably the other numbers were gradually entered as the information was received, and these entries shown in the boiler order book were as shown in column 2.  The likely (complete) actual allocations are shown in column 3.

Boiler No. Engine No. in
Boiler Order Book
Engine No. Ivatt Class Date Final Boiler No.
1 231 877

233

B3 – B4

B4

11/1901-7/1906

5/1910-4/1913

1422
2 **235 872

117

3175

B3 – B4

L1

J23

5/1901-6/1907

11/1911-1921

12/1924-9/1932

872
3 236 236

872

237

B3 – B4

B4

B3 – B4

3/1903-4/1907

6/1907-5/1910

9/1910-12/1913

1753
4 ***229 880 B3 – B4 5/1903-8/1911 1754
5 877 235 B3 – B4 8/1902-12/1913 1745

** 235 crossed out and replaced by “872”.  [No. 235 received boiler 522/5]

***229 crossed out.  [This engine remained Class B3]

The boilers were made to drawing N88, with 2-ring barrels, and the dome located on the first ring.  At the time of the survey of spare boilers in stock, construction had not yet started of the 3rd and 4th boilers (the 5th having just been completed, out of sequence), hence they were allocated numbers 1753/54 towards the end of the 17XX series.  Meanwhile a new drawing (N119 dated 20/10/1902) was issued for yet another batch of boilers for single-wheelers, with however 3-ring barrels to make use of {short length) steel plate remaining in stock suitable for 8ft.  singles (see BO537).  It is unlikely this new drawing had any bearing on the construction of the final boilers to be built of BO522, as there wouldn’t have been sufficient material left to complete BO537.

BO523 (27/4/1899).  5 domeless boilers for conversions to condensing (presumably to EO225, eventually issued 12/1899).  However the five engines which were converted shortly afterwards (Nos. 1048/50/46/47/51) retained their original boilers as the new ones were not ready. Later (probably September 1900) when the new boilers were ready, a further Engine Order was issued (EO228) for 5 more conversions, but using these new boilers.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 928 J14 9/1900 928
2 927 J14 10/1900 927
3 964 J14 10/1900 964
4 979 J14 11/1900 979
5 1054 J14 10/1900 1054

BO524 (6/5/1899).  10 boilers for renewals.  By the time their boiler numbers were allocated, No. 263 had become 263A hence its 17XX number.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 764 G3 – G4 1/1900 764
2 756 E2 – E1 1/1900 756
3 25 F2 – F3 2/1900 25
4 719 E2 – E1 3/1900 719
5 759 E2 – E1 9/1900 759
6 357 F2 – F3 10/1900 357
7 683 G3 – G4 9/1900 683
8 263 E2 – E1 4/1900 1710
9 99 E2 – E1 9/1900 99
10 542 E2 – E1 10/1900 542

BO525 (8/1899). 2 domeless boilers for renewals.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 630 G5 1/1900 630
2 502 F7 12/1903 1756

BO526 (26/10/1899).  20 boilers for new Class D1 4-4-0 (EO221, issued same day).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1366 D1 10/1900 1366
2 1367 D1 10/1900 1367
3 1368 D1 10/1900 1368
4 1369 D1 10/1900 1369
5 1370 D1 11/1900 1370
6 1371 D1 11/1900 1371
7 1372 D1 11/1900 1372
8 1373 D1 11/1900 1373
9 1374 D1 12/1900 1374
10 1375 D1 12/1900 1375
11 1376 D1 12/1900 1376
12 1377 D1 1/1901 1377
13 1378 D1 1/1901 1378
14 1379 D1 1/1901 1379
15 1380 D1 11/1900 1380
16 1381 D1 1/1901 1381
17 1382 D1 11/1900 1382
18 1383 D1 12/1900 1383
19 1384 D1 12/1900 1384
20 1385 D1 12/1900 1385

BO527 (26/10/1899).  20 boilers for new Class J5 0-6-0 (EO220, issued same day).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 165 J5 4/1900 165
2 177 J5 5/1900 177
3 179 J5 6/1900 179
4 180 J5 5/1900 180
5 192 J5 5/1900 192
6 302 J5 5/1900 302
7 303 J5 5/1900 303
8 304 J5 6/1900 304
9 306 J5 6/1900 306
10 308 J5 7/1900 308
11 384 J5 8/1900 384
12 386 J5 7/1900 386
13 387 J5 7/1900 387
14 388 J5 8/1900 388
15 390 J5 7/1900 390
16 392 J5 8/1900 392
17 394 J5 7/1900 394
18 396 J5 6/1900 396
19 398 J5 7/1900 398
20 399 J5 8/1900 399

BO528 (6/4/1900).  10 boilers for new Class A5 4-2-2 (EO222, issued 1/8/1900).  The boiler in No. 92 was afterwards allocated the number 1709 as the boiler in Class B1 2-2-2 No. 92A had already been allocated the number 92.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 92 A5 6/1901 1709
2 100 A5 6/1901 100
3 261 A5 6/1901 261
4 262 A5 6/1901 262
5 263 A5 6/1901 263
6 264 A5 6/1901 264
7 265 A5 9/1901 265
8 268 A5 10/1901 268
9 269 A5 10/1901 269
10 270 A5 10/1901 270

BO529 (6/4/1900).  10 boilers for new Class C2 4-4-2T (EO223, issued same day).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 1521 C2 6/1901 1521
2 1522 C2 6/1901 1522
3 1523 C2 6/1901 1523
4 1524 C2 10/1901 1524
5 1525 C2 8/1901 1525
6 1526 C2 9/1901 1526
7 1527 C2 6/1901 1527
8 1528 C2 11/1901 1528
9 1529 C2 10/1901 1529
10 1530 C2 11/1901 1530

BO530 (21/2/1901).  1 boiler for new Class C1 4-4-2 (EO224, issued 15 months earlier, 24/11/1899).  The late ordering date is unexplained.  It could be that Order numbers (BO, EO and TO) could be allocated in advance, with the actual order issue being delayed by last minute changes to the design holding up completion of the necessary drawings.

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 271 C1 7/1902 1743

BO531 (6/4/1900).  1 boiler for new Class K1 0-8-0 (EO226, issued same day).

Boiler No. Engine No. Ivatt Class Date Final Boiler No.
1 401 K1 2/1901 401

BO532 (20/6/1900).  20 boilers for renewals.  At the time this retrospective order book was being compiled, this order was not quite completed.  The allocations were mixed with many crossings out.  Some of the numbers originally entered were Engine Repair Order numbers (ERO), which were then amended after tracking down which engine related to which ERO.  Two other ERO’s entered were 730 and 731, against which the relevant engine numbers were not cross-referenced.  However, the relationship to the progress Nos. in Column 1 may not be correct.

Boiler No. ERO No. in Boiler Book Engine No. Ivatt Class Date Final Boiler No.
1 729 797 J6 – J5 1/1901 797
2   714 E2 – E1 3/1901 714
3   183 J6 – J5 2/1901 183
4   147 J6 – J5 3/1901 147
5   754 E2 – E1 3/1901 754
6 727 661 G3 – G4 3/1901 661
7   66 F2 – F3 4/1901 1752
8   64 F2 – F3 4/1901 64
9   107 F2 – F3 4/1901 107
10   862 E2 – E1 5/1901 862
11   102 J6 – J5 6/1901 102
12   90 E2 – E1 6/1901 90
13 749 793 J6 – J5 7/1901 793
14 734 850 J6 – J5 8/1901 1701
15 758 323 J6 – J5 10/1901 1423
16 733 313 J6 – J5 11/1901 1424
17 755 721 J6 – J5 10/1901 1425
18 759 716 J6 – J5 11/1901 1426
19 732 753 E2 – E1 11/1901 1427
20 752 538 F2 – F3 2/1902 1702

BO533 (24/7/1900).  6 vertical stationary boilers.

 Boiler No. Location Date SB No.
1 Crimpsall Mess Room /1902 SB63
2 Boston /1902 SB64
3 Peterborough /1902 SB65
4 Doncaster Bath & Office /1903 SB66
5 Aslockton 4/1903 ?SB67
6 Pinxton 4/1903 SB68

See Part 4 for later Boiler Orders