FINAL STIRLING DEVELOPMENT
With certain exceptions, Stirling’s largest boilers were only 4ft.-2in. or 4ft.-2½in. diameter. However, his 174 Class 0-6-0 of 1872 (Ivatt J4) had 4ft.-5in. diameter boilers, with 11ft.-4in. long barrels and 6ft.-2in. firebox casings (Boiler drawing N36). (The sort of boiler in fact which Stirling could have fitted to his single-wheelers had the close proximity of their driving wheels to the boiler not limited their maximum possible diameter to 4ft.-2in.). The number of their tubes was reduced in 1892 (N61). In 1879-80 he reboilered all ten Sturrock 270 Class 0-4-2WT (Ivatt F5), with 4ft.-5in. boilers (N40). In 1879 he considered fitting 4ft.-5in. boilers (N42) to new 2-4-0s (Ivatt E2), but this was vetoed on the grounds of cost. Then in 1886 he introduced 4ft.-5in. boilers (N55), as replacements for his 120 Class 0-4-4BT (Ivatt G2). Finally, in 1895 the 1879 proposal (N42) was resurrected for his new 1021 Class 0-6-0 (Ivatt J9), though Ivatt soon produced his domed version (N77). The development is set out below.
Two weeks after Stirling’s death an order was placed with Neilson & Co. for fifteen 921 Series 0-6-0ST, Nos. 1046-60.
DRAWINGS FOR 4ft.-5in. DIAMETER BOILERS
| Drawing No. | Date | Barrel + Firebox casing boiler tubes | Drawing title |
|---|---|---|---|
| N36 | 1871 | 11′-4″ + 6′-2″ 232 x 1¾” |
Goods boiler. Cyls. 19″ x 28″ |
| N40 | 1878 | 10′-0″ + 4′-6″ 162 x 15/8“ |
270 to 279 |
| N42 | 8/1879 | 10′-2″ + 5′-6″ 201 x 15/8“ |
6′-6″ passenger engines |
| N55 | 1886 | 9′-10″ + 4′-6″ 201 x 15/8“ |
4′-5″ boiler for Metro Bogie Tank Engines to replace old boilers |
| N61 | 1892 | 11′-4″ + 6′-2″ 207 x 1¾” |
Boiler for goods engines |
| N65 | 15/1/1895 | 10′-1″ + 5′-6″ 196 x 1¾” |
Boiler for Goods Engines with 4′-6″ wheels 1021 to 1026 |
| N71 | 18/2/1896 | 10-1″ + 5′-6″ 215 x 1¾” |
Boilers for 1081- 1090 |
| N77 | 7/1896 | 10′-1″ + 5′-6″ 215 x 1¾” |
Standard boiler for Goods & Passenger Engines |
The position at the time of Stirling’s death (11/1895) was as follows:
Class F5. Nos. 270-79 intact, but all were withdrawn 1898-1905. In addition, it is possible that some (perhaps all) of the 241-50 series engines acquired 4ft.-5in. diameter boilers, but the official records showed conflicting evidence. Nos. 241A-250A were withdrawn 1898-1906.
Class G2. 13 engines still unaltered. Then No. 248 was dealt with (12/1895). 10 more were dealt with 1896-1901, leaving Nos. 652/55 unaltered.
Class J4 intact, but all six were withdrawn 1901-06.
Class J9. Nos. 1021-30 on order. These appeared 6-7/1896.
STIRLING – IVATT TRANSITION
At the time of Stirling’s death, Doncaster Works had a number of second-hand boilers available for re-use, with further new boilers on order.
Stirling fitted his 120 Class 0-4-4BT with larger diameter boilers (4ft.-5in. barrel diam., 9ft.-10in. barrel length, 4ft.-6in. firebox casing length) from 1886 onwards, leaving thirteen engines still to be dealt with. No. 245 was reboilered 12/1895, and meanwhile a further ten boilers had been ordered, which were fitted as follows.
| Engine No. | Fitted | Engine No. | Fitted | |
|---|---|---|---|---|
| 531 | 1/1896 | 625 | 2/1899 | |
| 628 | 2/1896 | 247 | 5/1899 | |
| 657 | 2/1896 | 622 | 6/1899 | |
| 159 | 3/1896 | 249 | 6/1900 | |
| 246 | 9/1897 | 250 | 6/1901 |
This left Nos. 652/55 unaltered, which eventually acquired Ivatt domed 4ft.-5in. boilers instead (see BO512).
A new boiler (4ft.-0½in. barrel diam, 10ft. barrel length, 4ft.-10in. firebox casing length) was fitted to non-standard 0-6-0ST No. 395 (fitted perhaps 2/1897 at Doncaster Carr). This engine was the Carr Loco Pilot, by the time that the LDO was trying to sort out the boiler business in 1901. Under the new numbering system its boiler eventually became No. 395. After 9/1906 it served as a stationary boiler at the Carr Wagon shops (as SB223).
Stirling fitted Sturrock 251 Class 2-4-0 with larger boilers (4ft.-2½in. barrel diam., 10ft. barrel length, 5ft.-4in firebox casing length) in the late ’eighties and early ’nineties, the later ones no doubt being made from steel. The last one to be fitted was No. 259 (2/1896). Afterwards No. 258 acquired its second larger boiler (8/1899), which was second-hand previously fitted to No. 254.
Stirling also fitted Sturrock 270 Class 0-4-2WT with larger boilers (4ft.-5in. barrel diam., 10ft. barrel length, 4ft.-10in. firebox casing length) around the late ’seventies. He then started replacing them with new steel boilers, No. 271 being the first (11/1894). It is quite likely several replacement steel boilers were built, and some could have been fitted at unrecorded dates to the rather similar 241 Class. Between these two classes the following acquired what were apparently new boilers: Nos. 278 (10/1897), 275 (3/1898), 247A (7/1900), 245A (2/1902). No. 275’s boiler afterwards served (as SB252) at Muskham Pumping Station (1909-41), which is an interesting link to an engine built in 1867.
Of great significance about this time was the extended use of boilers removed from older engines, which had either been given replacement boilers or scrapped. This practice was introduced in 1896, when some Sturrock engines were withdrawn with serviceable boilers. The following Sturrock 0-6-0’s acquired second-hand boilers.
| Engine No. | Boiler fitted | Boiler from | Boiler No. (a) | Engine Withdrawn |
|---|---|---|---|---|
| 362A | 5/1900 | 444 | 1741 | 8/1908 |
| 407 | 8/1900 | 464 | 407 | 10/1902 |
| 359A | 10/1900 | 425 | 1732 | 5/1903 |
| 332A | 1/1901 | 318 | 1731 | 8/1905 |
| 329 | 10/1901 | 168 | 1725 | 1/1903 |
| 419 | 12/1901 | 453 | 453 | 8/1906 |
| 448 | 12/1901 | 458 | 458 | 10/1902 |
| 408 | 2/1902 | 447 | 447 | 7/1908 |
| 411 | 3/1902 | 411 | 448 | 6/1907 |
| 192A | 10/1903 | 448 | 458 | (boiler off 1/1907) |
| 304A | 11/1904 | 454 | 454 | 11/1909 |
| 425 | 12/1904 | 359A | 1732 | 10/1906 |
| 192A | 3/1907 | 427A | 427 | 1/1909 |
(a) Numbers were allocated 2/1901, but boilers only physically numbered at their next Works visit.
IVATT’S INHERITANCE
In May 1895, the Works Manager at Doncaster, John Shotton, died followed by Patrick Stirling on 11th November 1895. Douglas Earle Marsh (1862-1933), the new Works Manager & Assistant Locomotive Engineer, was appointed in December 1895, whilst the new Locomotive Engineer, Henry Alfred Ivatt (1851-1923), arrived at Doncaster 1st March 1896. Meanwhile the Acting Locomotive Engineer was Matthew Stirling. New drawings produced in the Locomotive Drawing Office (LDO) around this time included:
| Dwg. No. | Drawing Type | Issue date | Barrel Dia | Marked up for |
|---|---|---|---|---|
| N65 | Boiler | 15/1/1895 | 4′-5″ | Goods engines with 4′-6″ coupled wheels; 196 small tubes;
firebox grate area 16.22 sq ft; boiler pressure 160 psi |
| P36 | General
Arrangement |
15/1/1895 | 4′-5″ | Goods engines Nos. 1021-26.
Drawing reissued 9/1896 |
| N66 | Boiler | 11/1895 | 4′-2½” | Goods engines with 5′-0″ coupled wheels |
| P37 | General
Arrangement |
11/1895 | 4′-2½” | Goods engines to be numbered 1031-45 |
| N71 | Boiler | 18/2/1896 | 4′-5″ | Revised version of N65. 215 small tubes; firebox grate area 17.8 sq. ft.
(by reducing the width of the foundation ring from 3″ to 1¾”); boiler pressure 170 psi. |
| N77 | Boiler | 7/1896 | 4′-5″ | Domed version of N71. 2-ring barrel, instead of the 3 rings Stirling favoured |
The larger boiler had been instigated by Stirling, and followed through by Ivatt.
Ivatt would have been appointed to succeed Stirling on the strength of his intended strategy in the Locomotive Department, and he would not have wanted to waste any time whilst “working his notice” with the Great Southern & Western Railway. It seems likely that in January 1896 orders were placed for fifty new engines, 10 each Classes D2, E1, J5, J6, J14 (here using Ivatt’s later Engine Classification), presumably as proposed by Ivatt. This gave the Locomotive Drawing Office a chance to start on the drawings, ready for when Ivatt took charge on 1st March, when he could then make certain alterations. New features he instigated were narrow “water legs” to increase the firebox grate area, provision of washing out plugs high up the firebox sides giving access to the roof of the inner firebox for removing scale, steam to be collected from the boiler at its highest point, i.e. in a dome, with the regulator valve in the dome.
Ivatt may also have provided drawings of current G.S.& W.R. 4-4-0s with 6ft.-7in. diameter coupled wheels, as the first G.N. 4-4-0 appeared within nine months of his arrival. There was no reference to express passenger engines at this time. Stirling had been having trouble with his latest 1003 Class 4-2-2, and Ivatt may have been content (for the moment) to improve their boilers, while he thought of a better solution which wouldn’t have a constraint on boiler diameter.
When Ivatt took over at Doncaster, no historical records were being kept, other than were essential for the smooth running of the company. From the scant information available, though there is no absolute proof, the system seems to have been as follows:
ENGINE STOCK BOOKS covered all engines in Capital Stock, with basic data, such as engine number, type, date built, brief details of repairs in Works and important repairs at sheds, and finally date withdrawn. Details of engines built, renewed or repaired were recorded in numerical order, thus for example details for No. 100 were entered on page 100. After an engine was withdrawn a line would have been drawn across the page and if the engine number was reused then details of the new engine would be added below the line, commencing with the word “Rebuilt”. A separate book was required for Duplicate List engines which would be entered randomly,
WORKS REPAIRS BOOKS contained more detail, essential if at a later date there was a “post mortem” enquiry into a component failure. The repair details in the Stock Books were cross-referenced to entries in these Repairs Books. These Repairs Books covered the earlier years as follows:
| Book | Coverage | Book | Coverage | Book | Coverage | ||
|---|---|---|---|---|---|---|---|
| 1 | not known | 5 | 1/1868-12/1870 | 9 | 1882-mid-1889 | ||
| 2 | not known | 6 | 1/1871-12/1874 | 10 | mid 1889-mid 1892 | ||
| 3 | not known | 7 | 1/1875-mid 1879 | 11 | mid 1892-1896 | ||
| 4 | ?-12/1867 | 8 | mid 1879-1881 | 12 | 1897-December 1898 |
The sole entry for a Stirling engine mentioned in Book 4 was No. 18, “Rebuilt” and ex-works 3/1/1868. This engine was the first one built at Doncaster, and its works plate showed 1867 as its date. (The next two engines built, Nos. 23 and 40, similarly showed 1867 on their works plates, but were in Book 5.)
Examples of boilers changed at Peterborough in 1889-90 are as follows.
- No. 446 (13/5/1889),
- No. 311 (15/7/1889),
- No. 189 (22/7/1889),
- No. 126 (6/8/1889),
- No. 10 (10/2/1890).
From January 1899 onwards Reports of Doncaster repairs were recorded in a new system starting at 1/1, going to around 1/100, then starting at 2/1, and so on. For example the repairs to Ivatt 2-2-2 No. 92 in 1916 are cross-referenced to 200/6. From January 1901 these Reports also included repairs undertaken at the sheds. The system continued until around Report 266/18 (June 1922) when either their recording in the Drawing Office Repairs Volumes simply ceased, or a new system had been introduced. Further examples of new boilers fitted at sheds, were as follows:
- No. 803 at Ardsley (21/5/1900),
- No. 664 at Ardsley (12/6/1900),
- No. 872 at King’s Cross (22/5/1901).
In addition there were probably record cards for individual engines which would be kept in engine order number. Until 1896 repair details for boilers were probably entered on the Engine Cards. Thus information was held in the Works in both engine number order and repair date order. Boiler record cards were introduced later, presumably some time between 1896 and 1901.
Accumulated mileages were being recorded for the life of each boiler (which prior to Ivatt arriving always stayed with the same engine throughout), so there could have been another simpler system running in parallel with mileage details for each engine (and thus boiler). As an aside, lifetime mileages are recorded for example for Class F2 0-4-2: Nos. 40 (1,066,694) and 81 (1,010,494), which amounts to roughly 30,000 miles per annum, or about 80 miles per day, seven days a week.
ORDER NUMBERS – JANUARY 1897
For accountancy purposes, a new system of recording Engine Orders (EO), Stores Orders (SO), Tender Orders (TO) and Engine Repair Orders (ERO) was introduced about January 1897. Current engine orders on the books were then numbered EO201 to EO204, boiler orders SO201 to SO206, and tender orders TO1 to TO4. Earlier Engine and Boiler Orders whose construction had been completed needed no recognition, though there were some new boilers in stock that had not yet been allocated. These were four domed boilers for Stirling single-wheelers (fitted between August 1897 and June 1899), and nine Ivatt domeless “standard” boilers for Stirling 0-6-0s (fitted between June 1898 and December 1899). New boilers were either marked off to a specific EO, or (if built as replacements) to a specific ERO.
New Engine Orders from May 1897 were numbered from EO206 upwards, but new Boiler Orders started a new series from SO500, it having been realised there was confusion with EOs and SOs having similar numbers.
When the Locomotive Drawing Office (LDO) started recording details of Engine Orders in 1901 (see below) they left EO202 blank. Presumably the clerk could find no trace of the order at that time, possibly because they could find no new boilers marked off to this Order, which there wouldn’t have been if the engines concerned had received spare boilers. The most likely solution is that it was an Order to build two new 0-6-0 saddle tanks, Nos. 111 and 155, with spare Stirling boilers. These engines appeared in August 1897, in the same month that the two Sturrock 0-6-0STs bearing these numbers were withdrawn. Then SO524 (dated 6th May 1899) was specifically recorded as “B.O. 524”.
There may have been some confusion in the LDO around this time, as it seems more likely that the Works would had introduced the BO system with BO500, or even with SO201 at the beginning of the system. No corroboration has been seen, either way, and it is considered more convenient and less confusing from here on to use the term BO, apart from the SO exceptions mentioned next.
Stores Orders also covered miscellaneous material, not directly accountable to a specific engine, possibly including spare axles, axle boxes, wheel centres, piston rods, etc. However, SO532 covered nine miscellaneous spare boilers. SO1007 covered the construction of ten new 4-4-0s, Nos. 1386-95, making use of spare material (but not the frames). SO2004 (12/1900) covered the completion of ten boilers from Kitson’s of Leeds.
BOILER NUMBERS – FEBRUARY 1901
For the boiler exchange system to work properly, it was necessary to keep track of all the boilers, yet for the time being they continued to remain unnumbered. It was not until around October 1900 that it was realised they had a problem. The solution involved numbering boilers and keeping a continuous record of the engines to which they were fitted.
REPAIRS TO ENGINES VOLUMES – AUGUST 1901
In August 1901 the REPAIRS TO ENGINES VOLUMES were started in the LDO. Details of existing engines were entered in the books by a young clerk, Walter William Lake (1875-1958), with details perhaps copied from the ENGINE STOCK BOOKS maintained in the Works (see earlier). Lake’s instructions were simple, just copy details below the last line drawn across a page. The current stock as at August 1901 was entered into 3 new volumes. Volume 1 covered Nos. 1 to 499 (with several blank pages), Volume 2 covered 500 to 1000 and Volume 3 covered 1001 upwards. Afterwards new engines, were entered in Volumes 1 or 2 as appropriate, if the page was blank, otherwise entered in Book 3,
Each entry following the last line drawn across a page was faithfully copied by Lake, including the word Rebuilt. Unfortunately many Stirling engines, mainly the early 4-2-2s (e.g. Nos. 1, 7, 8, 22, 34), had been given new frames and they too were described as Rebuilt, which was perhaps too strong a word. At a later date someone crossed out “Rebuilt” in these Repairs Volumes and entered in pencil “New engine complete” instead. But no attempt was made to insert the missing shopping dates. Page 60 was blank after the line had been drawn across the earlier history and Lake probably asked what to do. The answer was leave the page blank for future construction. At the same time it was realised Lake had been writing the word Rebuilt and he was told from Page 61 to write “New engine complete” instead.
Presumably the Works continued maintaining their STOCK LISTS for their information, whilst the LDO maintained their new Repairs Volumes so as to keep track of the boilers.
RECORDING OF ENGINE, BOILER AND TENDER ORDER NUMBERS – AUGUST 1901
The LDO also started keeping their own copies of the Works Engine, Tender and Boiler Orders (but they did not retain the actual orders themselves). With the boilers, the LDO copies commenced at Boiler Order 534 (issued 21st August 1900, executed 1901-02, see PART 4), which covered the first boilers to carry numbers when new, with the associated Engine Order 227 (issued 1st August 1900, see Appendix – E). These records were subsequently kept up-to-date, practically to the end of steam. Boiler numbers were recorded, and subsequent exchanges noted so that a close check could be kept of their allocations. These books should have been reliable, or as reliable as a copy of a copy can be.
The LDO also prepared a retrospective Composite Engine/Tender/Boiler Orders book for earlier orders back to 1896. In some cases the available information was rather sketchy and sometimes absent, so the book is neither complete nor accurate. The various crossings out in the Boiler Order section show the difficulties encountered when looking at the renewals. One page was allocated for each Boiler Order. In one column was entered the boiler progress number within the order, e.g. 501/1 for the first boiler of BO501. In column 2 were entered the numbers of the engines to which fitted that boiler was fitted (kept up-to-date to withdrawal), and in column 3 was entered its proposed (later actual) boiler number. With replacement boilers, there was a difficulty working out which boiler went where. They had been marked off to Engine Repair Orders, and these orders would then have to be located to work out to which engine they referred. There were notes at the bottom of each page showing the various crossings out before the right answer was (hopefully) found. The boiler number would be applied at its next shopping, and in most cases this was the same as the engine number in which the boiler was fitted on arrival in works.
The Composite Order Book only covered engines/boilers/tenders built at Doncaster, so ignored the following contracted out engines: 1031-45 (1896), 1046-60 (1896), 1091-1135 (1897-99), 1136-1173 (1900-01), 1181-1200 (1899-1900), 1211-15 (1897). It also ignored Nos. 111 and 155 built at Doncaster (1897). Apart from the latter two engines, the new engines were numbered at the upper end of the stock list, so their boiler numbers would not be confusing. Their subsequent boiler changes could be picked up anyway in the new REPAIRS TO ENGINES VOLUMES. The only known oddity with the contract boilers concerns Neilson 0-6-0ST No. 1054 which was reboilered in October 1900, at the very start of the numbering scheme, and the clerk showed its new boiler as being allocated 1054. However it seems to have gone out with an unnumbered boiler, which subsequently became number 67 when later fitted to No. 970. The late Willie Yeadon wrote “special 67” against No. 1054 in his notes, so he clearly considered that the 1900-built boiler was the one was with this special number.
Details of the 1896 to mid-1901 orders that appeared in the retrospective Boiler Order book are as follows.
Unnumbered order. 3 domeless boilers for Stirling single-wheelers, which were fitted to Nos. 234 (1/1896), 773 (3/1896) and 874 (9/1896). The original allocations for the first two of these boiler is interesting. No. 234 was the first 2-2-2 with a steel boiler (1886), whilst No. 773 was the first 4-2-2 with a steel boiler (1885). However, the 2-2-2 and 4-2-2 boilers were strictly not interchangeable, as their firebox casing widths differed by 1in. But a 4-2-2 boiler could be fitted to a 2-2-2 with special provision made for wider expansion brackets on the firebox sides. It seems likely they were originally part of an order for ten boilers, which was curtailed after plates had been cut for the first three, and restarted again after fresh drawings had been made. Specifically, these three boilers had 3-ring barrels, but the fresh drawings showed 2-ring barrels with a dome on the 2nd ring. See next order.
Unnumbered order. 7 domed boilers for Stirling 4-2-2 single-wheelers. These were fitted to Nos. 93, 776, 544, 95, 34, 22 and 221 in 1896-99. The date of the corresponding General Arrangement drawing (Q59) for domed 4-2-2 is not known. However, the domed boiler drawings, N69 (firebox end) and N70 (smokebox end), were both dated “Feby /96”. Hardly time for Ivatt (who arrived on 1st March 1896) to play much part in its original design, suggesting they were was drawn up with the sanction of the Acting Locomotive Engineer, Matthew Stirling.
The first engine altered was No. 93, in works 19th March to 18th June 1896. It had a larger dome than the six later engines, and the working pressure was only 170 lb./sq. in. The later boilers were set at 175 lb. The fitting of this boiler required the frames to be lengthened, so it was not just a routine boiler change, and there were financial considerations to be sanctioned. There could have been detail changes made after the drawings was first issued, right up to the point of the first boiler being used. This could explain why the first boiler used was actually the second one of the batch. The first boiler of the batch (in No. 776) probably had to have some alterations made after it had been completed. As fitted to No. 93 the significant changes over the previous Stirling version were as follows. Boiler barrel length 11ft.-3in. instead of 11ft.-5in., barrel made of two concentric rings instead of three, with a dome provided on the rear ring. Firebox casing length 6ft.-8in. (though the revised general arrangement drawing Q59 shows 6ft.-9in.) instead of 6ft.-2in. The throat plate sloped forward so that the overall horizontal length of the casing was 7ft., whilst its actual length measured on the slope was 7ft.-2in. The length on the slope on the inner firebox was 6ft.-8¼in. The width of the firebox foundation ring (the “water legs”) was 1¾in. instead of 3in,, thus increasing the area of the grate. Washout plugs were provided high up on the sides of the firebox. The first three boilers had their safety valves encased in Stirling-style brass covers, whilst the later engines had cast-iron covers, afterwards associated with Ivatt. The General Arrangement drawing Q59 was revised January 1899, specifically for the last engine altered No. 221 which was laid up in shops throughout the first half of 1899, ex-works on 30 June 1899.
Unnumbered order. At the beginning of 1896 a batch of 30 4ft.-5in. diameter domeless 3-ring boilers was on order: 10 for Class J9 Nos. 1021-30, 10 for Class J5 Nos. 1081-90, and ten spares for renewals for Classes J5 and J8. The order was too far advanced to be amended, once the barrel plates had been cut. There was considerable delay in the fitting of the ten spares, as preference was meantime given to further new “standard boilers” (to drawing N77, dated July 1896) which had 2-ring barrels and domes. The last of the spare domeless boilers was finally fitted (to No. 476) in December 1899.
Order 400E. 11 domed “standard” boilers, all still with the traditional brass safety valve casings. The first one was fitted to Ivatt’s first 4-4-0, Class D2 No. 400, followed by 10 for new Class E1 Nos. 1061-70. On the same page of this retrospective boiler order book the clerk tagged on ten similar boilers built by Dubs for new Class J5 Nos. 1091-1100. Their appearance on the same page as the earlier boilers may be nothing more than his desire to find somewhere to write down their numbers. The page was headed 400E, presumably the identification used in connection with material for the 4-4-0, which seems to have been regarded for accountancy purposes as a Renewal. However, the number 400 seems an unusual choice for a passenger engine, being in the goods engine number range.
All subsequent orders mentioned in this retrospective boiler order book had successive Boiler Order Nos. 201-06, 500-33, and these will be dealt with later. But there were clearly other boilers either built or first used around this time, in particular as follows.
The last two Doncaster-built Stirling engines, 0-6-0ST Nos. 111 and 155 (became Ivatt Class J14) appeared in 1897, with boilers having 4ft.-0½in. barrel diam., 10ft.-6in. barrel length, 5ft.-6in. firebox casing length. They were ostensibly replacements of older Sturrock engines, which in turn had also been “renewed” as 0-6-0ST in the 1860’s, then reboilered in 1881-82. The source of the boilers for Nos. 111 and 155 is not known, but they were most likely spare boilers that had been originally ordered for general renewal purposes. It is possible these two replacements were charged to EO202, but the evidence was either absent or overlooked in 1901 when details were being sought (see earlier).
BOILER ORDER BOOK ENTRIES
As the main purpose of the recording was concerned with keeping track of future builds, the clerk saw no point wasting time tracking down obsolescent types, and the following were ignored: Recent orders for Stirling boilers having 4ft-2½in diameter barrels (all classes), 4ft.-2in. boilers for the early 2-2-2s (Ivatt Class B5) and 4ft.-0½in. boilers for Classes J11, J15. No 4ft.-2½in. boilers were subsequently ordered. The 4ft.-5in. boilers for Class G2 were also ignored, though similar size boilers, however with domes, were ordered later by Ivatt. The 4ft.-0½in. boilers continued to be ordered down to August 1911, then no more under Gresley. In total there would be about sixty-six boilers ignored, probably ordered before Ivatt took over, and some would have been given low priority. In particular, Ivatt’s policy was to replace the 4ft.-2½in. boilers with 4ft.-5in. boilers. The various engines that received new boilers between 1896 and 1900, unaccounted for in the Drawing Office boiler order books, were as follows:
| Engine Class | Engine Nos |
|---|---|
| A2 | 664** (8/1896) |
| B5 | 39 (5/1897), 55 (10/1898), 63 (4/1897), 215 (2/1896) |
| E2 | 206 (7/1897), 209 (6/1898), 216 (4/1897), 263* (4/1900), 700 (10/1898), 703 (1/1897), 704 (1/1897), 706 (9/1897), 757 (7/1896) |
| E3 | 281 (1/1896), 286 (3/1899), 297 (7/1897), 299 (2/1896), 754 (9/1896) |
| F2 | 13 (3/1897), 16 (4/1898), 19 (11/1899), 65 (10/1897), 76 (6/1899), 77 (6/1898), 106 (1/1898), 243 (11/1900), 539 (4/1899) |
| F5 | 275 (5/1898), 278 (10/1897) |
| G2 | 246 (9/1897), 247 (5/1899), 504 (12/1899), 505 (3/1901), 531 (1/1896), 622 (6/1899), 625 (2/1899), 628 (2/1896), 657 (2/1896) |
| J2 | 305 (3/1896), 401* (5/1898), 418* (8/1898) |
| J6 | 101 (10/1897), 307 (2/1898), 310 (2/1896), 327 (6/1899), 644 (4/1898), 647 (4/1898), 649 (3/1898), 651 (4/1898), 718 (2/1898), 728 (6/1897) |
| J7 | 152 (9/1898), 477 (5/1896), 481 (4/1898), 482 (7/1896), 483 (8/1898) |
| J10 | 185 (11/1896), 189 (10/1896) |
| J15 | 617 (11/1896), 618 (5/1896), 674 (11/1896), 680 (10/1896), 783 (10/1896), 787 (11/1896), 805 (12/1896), 808 (12/1896) |
* Engines 263, 401, 418 afterwards transferred to Duplicate Stock
** No. 664’s 1896 boiler may have been ignored as this had been changed at Ardsley shed (6/1900) for a new boiler. The 1896 boiler, after repairs, was the one fitted to No. 1 (9/1900), recorded at the time as being ex-664.
Orders in the retrospective Boiler Order Book will now be listed in the Table below, and then dealt with individually in more detail later. Dates of issue were recorded for BO’s 500, 502-33, but the absence of dates for the others may simply be because the clerk did not bother to write them down. For ease of cross-reference, the Engine Classes in the following table are according to the later 1900 Ivatt Classifications. A hyphenated Ivatt Class (e.g. J17 – J16) denotes the engine classification changed as the result of the boiler change.
| BO | BO date | EO | Ivatt Class | Engine Nos. | Remarks |
|---|---|---|---|---|---|
| – | – | – | A2, B3 | various | 234, 773, 874 (domeless) |
| – | – | – | A3 | various | 776, 93, 544, 95, 34, 22, 221 (domes) |
| – | – | – | J9 J5 J6 – J5 J8 |
1021-30 1081-90 various various |
– – 743, 737, 796, 724, 748, 328, 321, 848 485, 476 |
| 400E | – | – | D2 E1 J5 |
400 1061-70 1091-1100 |
– – built by Dubs |
| 201 | – | 201. | D2 | 1071-80 | |
| – | J17 – J16
J5 |
606
(9) new |
1 rebuild, followed by: 315/16/18/29/31/32/34/36/37 |
||
| 203 | – | 203. | J12 | 1201-10 | |
| 204 | – | – | B4 | (5) various | 876, 240, 873, 871, 233 |
| 205 | – | – | J15 | (5) various | 601, 500, 688, 620, 858 |
| 206 | – | 204. | D2 | 1301-10 | |
| 500 | 19/5/1897 | 205.
– – – – – |
C2
D2 B5 – B7 E2- E1 G3 – G4 J5 J17 – J16 |
1009/10/13-20 1311-20(3) various(4) various(1) various338(1) various |
new
new 21, 41, 61 89, 212, 702, 867 763 new 610 |
| 501 | – | – | F7, G5 | (2) various | 629, 632 |
| 502 | 13/4/1897 | 206. | C1 | 990 | |
| 503 | 19/5/1897 | 213 | E1
D2 |
224
1341-49 |
|
| 504 | 19/5/1897 | – | – | – | A stationary boiler for Carr New Wagon Shop, barrel 4′-7in x 11′-0″ |
| 505 | 15/7/1897 | 209. | D1 | 1321-25 | |
| 506 | 15/7/1897 | 210 | A4 | 266 | |
| 507 | 10/11/1897 | – | A2 | (3) various | 771, 69, 94 |
| 508 | 13/12/1897 | 211 | D1 | 1326-35 | |
| 509 | 16/12/1897 | 212 | C2 | 1501-10 | |
| 510 | 17/12/1897 | – | J15 | (10) various | 790, 636, 859, 693, 782, 472, 635, 803, 860, 637 |
| 511 | 6/1/1898 | 213
– |
D2
E1, E4 |
1350
(9) various |
–
866, 760, 286, 540, 707, 715, 752, 819, 894 |
| 512 | 30/3/1898 | – | F6, G2 | (10) various | 248, 652, 117A, 132, 655, 118, 242, 116, 624, 122 |
| 513 | 12/5/1898 | – | J11
J17 (a) |
(4) various | 124, 167
611, 613 (a) |
| 514 | 12/7/1898 | – | A2 | (6) various | 548, 7, 670, 778, 664, 2 |
(a) J17 added later
| BO | BO date | EO | Ivatt Class | Engine Nos. | Remarks |
|---|---|---|---|---|---|
| 515 | 6/1/1899 | 215 | A5 | 267 | |
| 516 | 8/11/1898 | 214 | C2 | 1511-20 | |
| 517 | 4/11/1898 | 219 | D2 | 1351-60 | |
| 518 | 4/11/1898 | 217 | J5 | (10) new | 343-45/48-53/59-64/67/68/71/75/81 |
| 519 | 5/1/1899 | 216 | D1 | 1336-40, 1361-65 | |
| 520 | 5/1/1899 | 218 | C1 | 949/50/82-89 | 3″ wide foundation ring instead of 1¾” |
|
(521) |
19/1/1899 | – | C1 | (10) cancelled | probably intended for more Class C1 |
| 522 | 27/4/1899 | – | B4 | (5) various | 877, 872, 236, 880, 235 |
| 523 | 27/4/1899 | 228 | J14 | 928/27/64/79, 1054 | conversions to condensing with new boilers |
| 524 | 6/5/1899 | – | E1, F3, G4 | (10) various | 764, 756, 25, 719, 759, 357, 683, 263, 99, 542 |
| 525 | 8/1899 | – | F7, G5 | (2) various | 630, 502 |
| 526 | 26/10/1899 | 221 | D1 | 1366-85 | No. 1381 had 170 x 2″ diam, iron tubes remainder had 238 x 1¾” diam, copper tubes |
| 527 | 26/10/1899 | 220 | J5 | (20) new | 165/77/79/80/92, 302-04/06/08, 384/86-88/90/92/94/96/98/99 |
| 528 | 6/4/1900 | 222 | A5 | 92, 100, 261-65/68-70 | |
| 529 | 6/4/1900 | 223 | C2 | 1521-30 | |
| 530 | 21/2/1901 | 224 | C1 | 271 | 3″ wide “water legs” instead of 1¾” |
| – | – | 225 | J14 | 1048/50/46/47/51 | conversions to condensing with their old boilers |
| 531 | 6/4/1900 | 226 | K1 | 401 | 3″ wide “water legs” instead of 1¾” |
| 532 | 20/6/1900 | – | E1, F3, G4, J5 | (20) various | See later for numbers |
| 533 | 24/7/1900 | – | – | – | 6 vertical stationary boilers, 6′-10½” x 3′-6″, sent to Crimpsall Mess Room, Boston, Peterborough, Doncaster Bath & Office, Aslockton, Pinxton (last boiler said to have been “built Partington”) |
Thus the basis for checking the whereabouts of a particular boiler had a shaky start due to the lost years of recording during 1896-1901. Further discrepancies subsequently came to light. Furthermore, as already mentioned, no interest was as yet being taken of boilers fitted to engines on the Duplicate List.
Before covering in more detail these earlier Boiler Orders, which were entered up retrospectively around August 1901, the following orders for domeless boilers need to be mentioned, as they did not appear in any order book.
| Builder | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| Dubs | 1031 | J6 | 6/1896 | 1031 |
| “ | 1032 | J6 | 6/1896 | 1032 |
| “ | 1033 | J6 | 6/1896 | 1033 |
| “ | 1034 | J6 | 6/1896 | 1034 |
| “ | 1035 | J6 | 6/1896 | 1035 |
| “ | 1036 | J6 | 6/1896 | 1036 |
| “ | 1037 | J6 | 6/1896 | 1037 |
| “ | 1038 | J6 | 6/1896 | 1038 |
| “ | 1039 | J6 | 7/1896 | 1039 |
| “ | 1040 | J6 | 7/1896 | 1040 |
| “ | 1041 | J6 | 7/1896 | 1041 |
| “ | 1042 | J6 | 7/1896 | 1042 |
| “ | 1043 | J6 | 7/1896 | 1043 |
| “ | 1044 | J6 | 7/1896 | 1044 |
| “ | 1045 | J6 | 7/1896 | 1045 |
| Neilson | 1046 | J14 | 7/1897 | 1046 |
| “ | 1047 | J14 | 7/1896 | 1047 |
| “ | 1048 | J14 | 7/1896 | 1048 |
| “ | 1049 | J14 | 7/1896 | 1049 |
| “ | 1050 | J14 | 7/1896 | 1050 |
| “ | 1051 | J14 | 7/1896 | 1051 |
| “ | 1052 | J14 | 7/1896 | 1052 |
| “ | 1053 | J14 | 7/1896 | 1053 |
| “ | 1054 | J14 | 7/1896 | 67 |
| “ | 1055 | J14 | 7/1896 | 1055 |
| “ | 1056 | J14 | 7/1896 | 1056 |
| “ | 1057 | J14 | 7/1896 | 1057 |
| “ | 1058 | J14 | 7/1896 | 1058 |
| “ | 1059 | J14 | 7/1896 | 1059 |
| “ | 1060 | J14 | 7/1896 | 1060 |
| “ | 1211 | J14 | 6/1897 | 1211 |
| “ | 1212 | J14 | 6/1897 | 1212 |
| “ | 1213 | J14 | 6/1897 | 1213 |
| “ | 1214 | J14 | 6/1897 | 1214 |
| “ | 1215 | J14 | 6/1897 | 1215 |
| Doncaster | 111 | J14 | 8/1897 | 111 |
| “ | 155 | J14 | 8/1897 | 155 |
In addition, further contractor–built engines, this time with domed boilers, appeared in 1898-1901. Briefly these were:
| Contractor | Engine Nos. | Ivatt Class | Date | Final Boiler Nos. |
|---|---|---|---|---|
| Dubs | 1101-02 | J5 | 1898 | Same as engine |
| “ | 1103-35 | J5 | 1899 | “ |
| Kitson | 1136-60 | J5 | 1900 | “ |
| Dubs | 1163-73 | J5 | 1901 | “ |
The orders that were mentioned in the retrospective order book (which it will now be appreciated is not comprehensive) were as follows. The number in the first column is as shown in the boiler book, and is presumably intended to be its progress number within the order.
BO-. 3 domeless boilers for single-wheelers, 4ft.-2in. barrel diam., 11ft.-5in. barrel length, 3-ring barrels, 6ft.-2in. firebox casing length.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 234 | B3 | 1/1896 | 234 |
| 2 | 773 | A2 | 3/1896 | 773 |
| 3 | 874 | B4 | 9/1896 | 874 |
BO-. 7 domed boilers for single-wheelers, 4ft.-2in. barrel diam., 11ft.-3in. barrel length, 2-ring barrels, 6ft.-8in. firebox casing length.
| Boiler No. | Engine No. | Ivatt Class | Date | Safety valves | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 776 | A3 | 7/1896 | Stirling | 773 |
| 2 | 93 | A3 | 6/1896 | Stirling | 93 |
| 3 | 544 | A3 | 5/1897 | Stirling | 544 |
| 4 | 95 | A3 | 8/1897 | Ivatt | 95 |
| 5 | 34 | A3 | 12/1897 | Ivatt | 34 |
| 6 | 22 | A3 | 1/1898 | Ivatt | 22 |
| 7 | 221 | A3 | 6/1899 | Ivatt | 221 |
BO-. 30 domeless boilers ordered in 3 distinct batches.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1021 | J9 | 2/1896 | 1021 |
| 2 | 1022 | J9 | 2/1896 | 1022 |
| 3 | 1023 | J9 | 2/1896 | 1023 |
| 4 | 1024 | J9 | 2/1896 | 1024 |
| 5 | 1025 | J9 | 2/1896 | 1025 |
| 6 | 1026 | J9 | 3/1896 | 1026 |
| 7 | 1027 | J9 | 3/1896 | 1027 |
| 8 | 1028 | J9 | 3/1896 | 1028 |
| 9 | 1029 | J9 | 3/1896 | 1029 |
| 10 | 1030 | J9 | 4/1896 | 1030 |
| 11 | 1081 | J5 | 9/1896 | 1081 |
| 12 | 1082 | J5 | 10/1896 | 1082 |
| 13 | 1083 | J5 | 10/1896 | 1083 |
| 14 | 1084 | J5 | 10/1896 | 1084 |
| 15 | 1085 | J5 | 10/1896 | 1085 |
| 16 | 1086 | J5 | 11/1896 | 1086 |
| 17 | 1087 | J5 | 11/1896 | 1087 |
| 18 | 1088 | J5 | 11/1896 | 1088 |
| 19 | 1089 | J5 | 11/1896 | 1089 |
| 20 | 1090 | J5 | 12/1896 | 1090 |
| 21 | 743 | J6 – J5 | 5/1897 | 743 |
| 22 | 737 | J6 – J5 | 6/1898 | 737 |
| 23 | 796 | J6 – J5 | 6/1898 | 796 |
| 24 | 724 | J6 – J5 | 7/1898 | 724 |
| 25 | 748 | J6 – J5 | 10/1898 | 748 |
| 26 | 485 | J7 – J8 | 2/1899 | 485 |
| 27 | 328 | J6 – J5 | 3/1899 | 328 |
| 28 | 321 | J6 – J5 | 10/1899 | 321 |
| 29 | 848 | J6 – J5 | 10/1899 | 848 |
| 30 | 476 | J7 – J8 | 12/1899 | 476 |
BO “400E”. 11 boilers from Doncaster in two batches, with 10 Dubs boilers added.
| BoilerNo. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 400 | D2 | 12/1896 | 400 |
| 2 | 1061 | E1 | 2/1897 | 1061 |
| 3 | 1062 | E1 | 3/1897 | 1062 |
| 4 | 1063 | E1 | 3/1897 | 1063 |
| 5 | 1064 | E1 | 3/1897 | 1064 |
| 6 | 1065 | E1 | 3/1897 | 1065 |
| 7 | 1066 | E1 | 4/1897 | 1066 |
| 8 | 1067 | E1 | 4/1897 | 1067 |
| 9 | 1068 | E1 | 4/1897 | 1068 |
| 10 | 1069 | E1 | 4/1897 | 1069 |
| 11 | 1070 | E1 | 4/1897 | 1070 |
| – | 1091 | J5 | 12/1897 | 1091 |
| – | 1092 | J5 | 12/1897 | 1092 |
| – | 1093 | J5 | 12/1897 | 1093 |
| – | 1094 | J5 | 1/1898 | 1094 |
| – | 1095 | J5 | 2/1898 | 1095 |
| – | 1096 | J5 | 2/1898 | 1096 |
| – | 1097 | J5 | 2/1898 | 1097 |
| – | 1098 | J5 | 2/1898 | 1098 |
| – | 1099 | J5 | 2/1898 | 1099 |
| – | 1100 | J5 | 3/1898 | 1100 |
BO201. 10 boilers for EO201 (issued 25/1/1896).
| BoilerNo. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1071 | D2 | 5/1897 | 1071 |
| 2 | 1072 | D2 | 5/1897 | 1072 |
| 3 | 1073 | D2 | 6/1897 | 1073 |
| 4 | 1074 | D2 | 6/1897 | 1074 |
| 5 | 1075 | D2 | 6/1897 | 1075 |
| 6 | 1076 | D2 | 6/1897 | 1076 |
| 7 | 1077 | D2 | 6/1897 | 1077 |
| 8 | 1078 | D2 | 6/1897 | 1078 |
| 9 | 1079 | D2 | 6/1897 | 1079 |
| 10 | 1080 | D2 | 6/1897 | 1080 |
The boilers were intended to have the traditional Stirling brass safety valve casing, whilst for the next boiler order Ivatt cast-iron casings were to be fitted. However the safety valve casings of boilers 201/10 and 202/2 were switched, so that No. No. 1080 was the first engine with the new style casing.
BO202. 10 boilers almost certainly intended for EO205 (issued 18/1/1897), new 4-4-2T Nos. 1009/10/13-20. In the event, these engines received the first 10 boilers of BO500. Instead, the first boiler was used to rebuild an 0-6-0ST. A year or so later the remaining nine boilers were taken for (part) EO208 (issued 13/5/1897). The last engine of EO208 took the 23rd boiler of BO500.
<tbody/thead
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. | Remarks |
|---|---|---|---|---|---|
| 1 | 606 | J17 – J16 | 7/1897 | 606 | |
| 2 | 315 | J5 | 8/1898 | 315 | New engine |
| 3 | 316 | J5 | 8/1898 | 316 | New engine |
| 4 | 318 | J5 | 8/1898 | 318 | New engine |
| 5 | 329 | J5 | 8/1898 | 329 | New engine |
| 6 | 331 | J5 | 9/1898 | 331 | New engine |
| 7 | 332 | J5 | 8/1898 | 332 | New engine |
| 8 | 334 | J5 | 8/1898 | 334 | New engine |
| 9 | 336 | J5 | 9/1898 | 336 | New engine |
| 10 | 337 | J5 | 9/1898 | 337 | New engine |
BO203. 10 boilers for EO203 (issued 18/8/1896).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1201 | J13 | 3/1897 | 1201 |
| 2 | 1202 | J13 | 3/1897 | 1202 |
| 3 | 1203 | J13 | 9/1897 | 1203 |
| 4 | 1204 | J13 | 9/1897 | 1204 |
| 5 | 1205 | J13 | 9/1897 | 1205 |
| 6 | 1206 | J13 | 10/1897 | 1206 |
| 7 | 1207 | J13 | 10/1897 | 1207 |
| 8 | 1208 | J13 | 10/1897 | 1208 |
| 9 | 1209 | J13 | 10/1897 | 1209 |
| 10 | 1210 | J13 | 10/1897 | 1210 |
BO204. 5 boilers for renewals. There was a controversy over their initial allocation, and the numbers shown in the Boiler order book are given in Column 2.
| Boiler No. | Engine No. in Boiler Order Book | Actual Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 876 | 876 | B3 – B4 | 3/1899 | 876 |
| 2 | 240 | 240 | B3 – B4 | 7/1898 | 240 |
| 3 | 873 | 873 | B3 – B4 | 4/1898 | 873 |
| 4 | **237 | 871 | B3 – B4 | 8/1899 | 871 |
| 5 | 233 | 233 | B3 – B4 | 9/1899 | 233 |
** at some date, 237 was crossed out and replaced by 871. No. 237 was not altered to B4 until 1910 (see BO522 later).
BO205. 5 domeless boilers for renewals.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 601 | J15 | 5/1897 | 601 |
| 2 | 500 | J15 | 8/1897 | 500 |
| 3 | 688 | J15 | 7/1897 | 688 |
| 4 | 620 | J15 | 10/1897 | 620 |
| 5 | 858 | J15 | 12/1897 | 858 |
BO206. 10 boilers for EO204 (issued 1896).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1301 | D2 | 10/1897 | 1301 |
| 2 | 1302 | D2 | 10/1897 | 1302 |
| 3 | 1303 | D2 | 11/1897 | 1303 |
| 4 | 1304 | D2 | 11/1897 | 1304 |
| 5 | 1305 | D2 | 11/1897 | 1305 |
| 6 | 1306 | D2 | 11/1897 | 1306 |
| 7 | 1307 | D2 | 11/1897 | 1307 |
| 8 | 1308 | D2 | 12/1897 | 1308 |
| 9 | 1309 | D2 | 12/1897 | 1309 |
| 10 | 1310 | D2 | 12/1897 | 1310 |
BO500 (19/5/1897) 30 boilers were ordered. They were shown as “available for 6′-6″ H or S”. This is a rare example of the use of these codes in the LDO, which codes were published by Geo. Fredk. Bird in his “The Locomotives of the Great Northern Railway” (1902). The boilers appeared in three distinct batches, which virtually meant they were not interchangeable. The expansion brackets at the sides of the fireboxes were positioned 2ft.-1½in., 2ft.-7¼in. and 2ft.-11½in. below the barrel centre line, respectively for new Class C2 4-4-2T (EO205, issued 18/1/1897), new Class D2 4-4-0 (EO207, issued May 1897 [either 12th or 13th, the top corner of the page had been torn off]), and finally almost certainly new Class J5 0-6-0 (EO208, issued 13/5/1897). To speed up delivery of the last EO, 9 boilers were taken from BO202. (with expansion brackets already marked off for this class), so that boilers 500/21, 500/22, and 500/24 to 500/30 were used instead for renewals, though it should be noted that many of the renewals still appeared before the new engines. The best laid plans often go astray.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. | Remarks |
|---|---|---|---|---|---|
| 1 | 1009 | C2 | 2/1898 | 1009 | |
| 2 | 1010 | C2 | 2/1898 | 1010 | |
| 3 | 1013 | C2 | 5/1898 | 1013 | |
| 4 | 1014 | C2 | 3/1898 | 1014 | |
| 5 | 1015 | C2 | 10/1898 | 1015 | |
| 6 | 1016 | C2 | 10/1898 | 1016 | |
| 7 | 1017 | C2 | 10/1898 | 1017 | |
| 8 | 1018 | C2 | 12/1898 | 1018 | |
| 9 | 1019 | C2 | 12/1898 | 1019 | |
| 10 | 1020 | C2 | 2/1899 | 1020 | |
| 11 | 1311 | D2 | 3/1898 | 1311 | |
| 12 | 1312 | D2 | 3/1898 | 1312 | |
| 13 | 1313 | D2 | 4/1898 | 1313 | |
| 14 | 1314 | D2 | 5/1898 | 1314 | |
| 15 | 1315 | D2 | 4/1898 | 1315 | |
| 16 | 1316 | D2 | 4/1898 | 1316 | |
| 17 | 1317 | D2 | 5/1898 | 1317 | |
| 18 | 1318 | D2 | 5/1898 | 1318 | |
| 19 | 1319 | D2 | 6/1898 | 1319 | |
| 20 | 1320 | D2 | 6/1898 | 1320 | |
| 21 | 21 | B5 – B7 | 10/1897 | 21 | |
| 22 | 610 | J17 – J16 | 9/1897 | 610 | |
| 23 | 338 | J5 | 10/1898 | 338 | New engine |
| 24 | 212 | E2 – E1 | 2/1899 | 212 | |
| 25 | 867 | E2 – E1 | 5/1898 | 867 | |
| 26 | 41 | B5 – B7 | 3/1898 | 41 | |
| 27 | 61 | B5 – B7 | 4/1898 | 61 | |
| 28 | 89 | E2 – E1 | 3/1898 | 89 | |
| 29 | 763 | G3 – G4 | 7/1898 | 763 | |
| 30 | 702 | E2 – E1 | 3/1898 | 702 |
BO501. 2 domeless boilers for renewals for 0-4-4T and 0-4-2T. There was a confliction over the barrel length of the first boiler (501/1}, with the order book showing 9ft.-3in., but the allocation book showing 9ft. I made a note (28/2/1968) that I had spotted a classification chart with the length 9ft.amended in red ink to 9ft.-3in.
| Boiler No. | EngineNo. | Ivatt Class | Date | Final Boiler No,. |
|---|---|---|---|---|
| 1 | 629 | G5 | 6/1898 | 629 |
| 2 | 632 | F7 | 5/1897 | 632 |
BO502 (13/4/1897). 1 boiler for new Class C1 (EO206, issued 12/5/1897).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 990 | C1 | 5/1898 | 990 |
BO503 (19/5/1897). 10 boilers, original intention unknown. They were ultimately allotted to new Class D2 (EO213 issued 6/1/1898), though subsequently the first boiler (503/1) was used as a renewal, and in due course the last engine of the order (1350) took a renewal boiler (511/1) out of BO511.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. | Remarks |
|---|---|---|---|---|---|
| 1 | 224 | E2 – E1 | 10/1898 | 224 | |
| 2 | 1341 | D2 | 12/1898 | 1341 | New engine |
| 3 | 1342 | D2 | 11/1898 | 1342 | New engine |
| 4 | 1343 | D2 | 12/1898 | 1343 | New engine |
| 5 | 1344 | D2 | 12/1898 | 1344 | New engine |
| 6 | 1345 | D2 | 12/1898 | 1345 | New engine |
| 7 | 1346 | D2 | 12/1898 | 1346 | New engine |
| 8 | 1347 | D2 | 12/1898 | 1347 | New engine |
| 9 | 1348 | D2 | 12/1898 | 1348 | New engine |
| 10 | 1349 | D2 | 12/1898 | 1349 | New engine |
BO504 (19/5/1897). 1 stationary boiler for Carr New Wagon Shop (shown as 4ft.-7in. x 11ft., working at 90 lb. psi). It is not clear whether the barrel diameter or firebox length was 4ft.-7in.
BO505 (15/7/1897). 5 boilers for new Class D1 4-4-0 (EO209, issued same day).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1321 | D1 | 6/1898 | 1321 |
| 2 | 1322 | D1 | 6/1898 | 1322 |
| 3 | 1323 | D1 | 6/1898 | 1323 |
| 4 | 1324 | D1 | 6/1898 | 1324 |
| 5 | 1325 | D1 | 7/1898 | 1325 |
BO506 (15/7/1897). 1 boiler for new Class A4 4-2-2 (EO210, issued 21/2/1897).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 266 | A4 | 10/1898 | 266 |
BO507 (10/11/1907). 3 domeless boilers for renewals.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 771 ** | A2 | 7/1898 | 771 |
| 2 | 69 | A2 | 6/1898 | 69 |
| 3 | 94 | A2 | 5/1898 | 94 |
** This boiler was later fitted to 2-2-2 No. 234 (8/1904), the only example of a 4-2-2 boiler being afterwards carried by a 2-2-2.
BO508 (13/12/1897). 10 boilers for new Class D1 4-4-0 (EO211, issued 1/1898).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1326 | D1 | 10/1898 | 1326 |
| 2 | 1327 | D1 | 10/1898 | 1327 |
| 3 | 1328 | D1 | 10/1898 | 1328 |
| 4 | 1329 | D1 | 11/1898 | 1329 |
| 5 | 1330 | D1 | 11/1898 | 1330 |
| 6 | 1331 | D1 | 11/1898 | 1331 |
| 7 | 1332 | D1 | 11/1898 | 1332 |
| 8 | 1333 | D1 | 11/1898 | 1333 |
| 9 | 1334 | D1 | 11/1898 | 1334 |
| 10 | 1335 | D1 | 11/1898 | 1335 |
BO509 (16/12/1897) 10 boilers for new Class C2 4-4-2T (EO212, issued 6/1/1898).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1501 | C2 | 2/1899 | 1501 |
| 2 | 1502 | C2 | 3/1899 | 1502 |
| 3 | 1503 | C2 | 3/1899 | 1503 |
| 4 | 1504 | C2 | 3/1899 | 1504 |
| 5 | 1505 | C2 | 4/1899 | 1505 |
| 6 | 1506 | C2 | 4/1899 | 1506 |
| 7 | 1507 | C2 | 4/1899 | 1507 |
| 8 | 1508 | C2 | 4/1899 | 1508 |
| 9 | 1509 | C2 | 5/1899 | 1509 |
| 10 | 1510 | C2 | 5/1899 | 1510 |
BO510 (17/12/1897). 10 domeless boilers for renewals. There is a discrepancy in the allocation shown in the boiler order book (see column 2 below).
| Boiler No. | Engine No. in Boiler Order Book | Actual Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 700 | 790 | J15 | 4/1899 | 790 |
| 2 | 636 | 636 | J15 | 8/1898 | 636 |
| 3 | 859 | 859 | J15 | 6/1898 | 859 |
| 4 | 693 | 693 | J15 | 6/1898 | 693 |
| 5 | 782 | 782 | J15 | 4/1899 | 782 |
| 6 | 472 | 472 | J15 | 5/1899 | 472 |
| 7 | 635 | 635 | J15 | 6/1899 | 635 |
| 8 | 803 | 803 | J15 | 4/1900 | 803 |
| 9 | **473 | 860 | J15 | 8/1900 | 860 |
| 10 | ***616 | ***637 | J15 | 3/1901 | 637 |
** No. 473 was shopped in 1899 (no boiler change) and not shopped again until 1903.
*** 616 was crossed out and altered to read 637.
BO511 (6/1/1898). 10 boilers for renewals, but the first boiler (511/1} was taken for the last engine of EO213 (see BO503 earlier).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. | Remarks |
|---|---|---|---|---|---|
| 1 | 1350 | D2 | 12/1898 | 1350 | New engine |
| 2 | 866 | E2 – E1 | 2/1899 | 866 | |
| 3 | 760 | E2 – E1 | 8/1899 | 760 | |
| 4 | 286 | E3 – E4 | 2/1899 | 286 | Avonside 1868 engine |
| 5 | 540 | E2 – E1 | 5/1899 | 540 | |
| 6 | 707 | E2 – E1 | 7/1899 | 707 | |
| 7 | 715 | E2 – E1 | 8/1899 | 715 | |
| 8 | 752 | E2 – E1 | 4/1899 | 752 | |
| 9 | 819 | E2 – E1 | 10/1899 | 819 | |
| 10 | 894 | E2 – E1 | 10/1899 | 894 |
BO512 (30/3/1898) 10 boilers for renewals. At the time this retrospective order book was being compiled, only 512/6 and 512/10 and been fitted. Two, 512/4 and 512/8, were spare, with the remainder (apparently) not yet assembled. When 512/2 was completed and fitted to No. 654 it was given the “special number 254”, which was a boiler number not otherwise allocated. The remaining boilers when finally used were given the next available numbers in the main list. A note was made (dated April 1908) that 512/1, 512/7 and 512/9 were in stock, so evidently they were not always assembled to order, but could hang around unused for several years, and certainly for at least 5 years as in the case of 512/7.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 248 | G2 | 12/1912 | 7192 |
| 2 | 652 | G2 | 9/1905 | 254 |
| 3 | 117A | F4 – F6 | 2/1907 | 6822 |
| 4 | 132 | F4 – F6 | 12/1904 | 1757 |
| 5 | 655 | G2 | 2/1907 | 6823 |
| 6 | 118 | F4 – F6 | 10/1899 | 118 |
| 7 | 242 | G2 | 3/1913 | 7193 |
| 8 | 116 | F4 – F6 | 6/1902 | 1714 |
| 9 | 624 | G2 | 12/1909 | 7005 |
| 10 | 122 | F4 – F6 | 10/1900 | 122 |
BO513 (12/5/1898). 4 domeless boilers for renewals, with 4ft.-10in. firebox casing length for Class J11. Only two built initially, the last two much later with 4ft.-6in. firebox casing length for Class J17.
| Boiler No. | Engine No. in Boiler Order Book | Actual Engine Nos. | Ivatt Class | Dates | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 124 | 124 | J11 | 2/1899-11/1905 | 124 |
| 2 | 167 | 167 | J11 | 5/1899-6/1904 | 167 |
| 3 | 611 | 611 | J17 | 2/1908-1/1928 | 6876 |
| 4 | 613 | 613 | J17 | 9/1910-11/1925 | 7031 |
BO514 (12/7/1898). 6 domeless boilers for renewals. There were slight discrepancies in the boiler allocations shown in the order book (see column 2 below).
| Boiler No. | Engine No. in Boiler Order Book | Actual Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 548 | 548 | A2 | 3/1899 | 548 |
| 2 | 7 | 7 | A2 | 6/1899 | 7 |
| 3 | 670 | 670 | A2 | 7/1899 | 670 |
| 4 | **98 | 778 | A2 | 8/1900 | 778 **** |
| 5 | ***549 | 664 | A2 | 9/1900 | 664 |
| 6 | – | 2 | A2 | 12/1900 | 2 |
** 98 crossed out (engine withdrawn 5/1900) and replaced by 778.
*** 549 crossed out and replaced by 164, crossed out replaced by 664.
**** Boiler 778 was fitted to Stirling No. 1 (5/1925)
(20 September 1953)
photo by the author
(May 1967)
photo by Kenneth H. Leech (his wife Gladys is on the left)
(27 July 2003)
photo by the author
BO515 (6/1/1899). 1 boiler for new Class A5 4-2-2 (EO215, issued previous day 5/1/1899).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 267 | A5 | 5/1900 | 267 |
BO516 (8/11/1898). 10 boilers for new Class C2 4-4-2T (EO214, issued 13/8/1898).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1511 | C2 | 8/1899 | 1511 |
| 2 | 1512 | C2 | 8/1899 | 1512 |
| 3 | 1513 | C2 | 8/1899 | 1513 |
| 4 | 1514 | C2 | 9/1899 | 1514 |
| 5 | 1515 | C2 | 10/1899 | 1515 |
| 6 | 1516 | C2 | 10/1899 | 1516 |
| 7 | 1517 | C2 | 10/1899 | 1517 |
| 8 | 1518 | C2 | 10/1899 | 1518 |
| 9 | 1519 | C2 | 11/1899 | 1519 |
| 10 | 1520 | C2 | 11/1899 | 1520 |
BO517 (4/11/1898). 10 boilers for new Class D2 4-4-0 (EO219, issued 22/2/1899).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1351 | D2 | 11/1899 | 1351 |
| 2 | 1352 | D2 | 11/1899 | 1352 |
| 3 | 1353 | D2 | 11/1899 | 1353 |
| 4 | 1354 | D2 | 12/1899 | 1354 |
| 5 | 1355 | D2 | 12/1899 | 1355 |
| 6 | 1356 | D2 | 12/1899 | 1356 |
| 7 | 1357 | D2 | 12/1999 | 1357 |
| 8 | 1358 | D2 | 12/1899 | 1358 |
| 9 | 1359 | D2 | 12/1899 | 1359 |
| 10 | 1360 | D2 | 12/1899 | 1360 |
BO518 (4/11/1898). 20 boilers for new Class J5 0-6-0 (EO217, issued 5/1/1899).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 343 | J5 | 7/1899 | 343 |
| 2 | 344 | J5 | 7/1899 | 344 |
| 3 | 345 | J5 | 7/1899 | 345 |
| 4 | 348 | J5 | 7/1899 | 348 |
| 5 | 349 | J5 | 7/1899 | 349 |
| 6 | 350 | J5 | 7/1899 | 350 |
| 7 | 351 | J5 | 7/1899 | 351 |
| 8 | 352 | J5 | 7/1899 | 352 |
| 9 | 353 | J5 | 7/1899 | 353 |
| 10 | 359 | J5 | 7/1899 | 359 |
| 11 | 360 | J5 | 7/1899 | 360 |
| 12 | 361 | J5 | 6/1899 | 361 |
| 13 | 362 | J5 | 6/1899 | 362 |
| 14 | 363 | J5 | 8/1899 | 363 |
| 15 | 364 | J5 | 8/1899 | 364 |
| 16 | 367 | J5 | 8/1899 | 367 |
| 17 | 368 | J5 | 9/1899 | 368 |
| 18 | 371 | J5 | 8/1899 | 371 |
| 19 | 375 | J5 | 9/1899 | 375 |
| 20 | 381 | J5 | 9/1899 | 381 |
BO519 (5/1/1899). 10 boilers for new Class D1 4-4-0 (EO216, issued same day 5/1/1899).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1336 | D1 | 9/1899 | 1336 |
| 2 | 1337 | D1 | 10/1899 | 1337 |
| 3 | 1338 | D1 | 10/1899 | 1338 |
| 4 | 1339 | D1 | 10/1899 | 1339 |
| 5 | 1340 | D1 | 10/1899 | 1340 |
| 6 | 1361 | D1 | 11/1899 | 1361 |
| 7 | 1362 | D1 | 10/1899 | 1362 |
| 8 | 1363 | D1 | 10/1899 | 1363 |
| 9 | 1364 | D1 | 11/1899 | 1364 |
| 10 | 1365 | D1 | 11/1899 | 1365 |
BO520 (5/1/1899). 10 boilers for new Class C1 4-4-2 (EO218, issued next day 6/1/1899). Three of these boilers (989/86/83) were latterly fitted to LNER Classes Q1 and Q2 Nos. 3417 (3/1924), 3418 (8/1924), 3435 (5/1925), for which they would need to have had new shallow firebox casings fitted.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 949 | C1 | 3/1900 | 949 |
| 2 | 950 | C1 | 4/1900 | 950 |
| 3 | 982 | C1 | 4/1900 | 982 |
| 4 | 983 | C1 | 5/1900 | 983 |
| 5 | 984 | C1 | 6/1900 | 984 |
| 6 | 985 | C1 | 6/1900 | 985 |
| 7 | 986 | C1 | 5/1900 | 986 |
| 8 | 987 | C1 | 5/1900 | 987 |
| 9 | 988 | C1 | 6/1900 | 988 |
| 10 | 989 | C1 | 6/1900 | 989 |
BO521 (19/1/1899). 10 boilers (for new Class C1 4-4-2, possibly in anticipation of a forthcoming order). The BO was then cancelled, and in due course replaced by BO544.
BO522 (27/4/1899). 5 boilers for renewals. At the time this retrospective order book was being compiled (August 1901), only 522/2 had been fitted. Presumably the other numbers were gradually entered as the information was received, and these entries shown in the boiler order book were as shown in column 2. The likely (complete) actual allocations are shown in column 3.
| Boiler No. | Engine No. in Boiler Order Book |
Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 231 | 877
233 |
B3 – B4
B4 |
11/1901-7/1906
5/1910-4/1913 |
1422 |
| 2 | **235 | 872
117 |
B3 – B4
L1 J23 |
5/1901-6/1907
11/1911-1921 12/1924-9/1932 |
872 |
| 3 | 236 | 236
872 237 |
B3 – B4
B4 B3 – B4 |
3/1903-4/1907
6/1907-5/1910 9/1910-12/1913 |
1753 |
| 4 | ***229 | 880 | B3 – B4 | 5/1903-8/1911 | 1754 |
| 5 | 877 | 235 | B3 – B4 | 8/1902-12/1913 | 1745 |
** 235 crossed out and replaced by “872”. [No. 235 received boiler 522/5]
***229 crossed out. [This engine remained Class B3]
The boilers were made to drawing N88, with 2-ring barrels, and the dome located on the first ring. At the time of the survey of spare boilers in stock, construction had not yet started of the 3rd and 4th boilers (the 5th having just been completed, out of sequence), hence they were allocated numbers 1753/54 towards the end of the 17XX series. Meanwhile a new drawing (N119 dated 20/10/1902) was issued for yet another batch of boilers for single-wheelers, with however 3-ring barrels to make use of {short length) steel plate remaining in stock suitable for 8ft. singles (see BO537). It is unlikely this new drawing had any bearing on the construction of the final boilers to be built of BO522, as there wouldn’t have been sufficient material left to complete BO537.
BO523 (27/4/1899). 5 domeless boilers for conversions to condensing (presumably to EO225, eventually issued 12/1899). However the five engines which were converted shortly afterwards (Nos. 1048/50/46/47/51) retained their original boilers as the new ones were not ready. Later (probably September 1900) when the new boilers were ready, a further Engine Order was issued (EO228) for 5 more conversions, but using these new boilers.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 928 | J14 | 9/1900 | 928 |
| 2 | 927 | J14 | 10/1900 | 927 |
| 3 | 964 | J14 | 10/1900 | 964 |
| 4 | 979 | J14 | 11/1900 | 979 |
| 5 | 1054 | J14 | 10/1900 | 1054 |
BO524 (6/5/1899). 10 boilers for renewals. By the time their boiler numbers were allocated, No. 263 had become 263A hence its 17XX number.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 764 | G3 – G4 | 1/1900 | 764 |
| 2 | 756 | E2 – E1 | 1/1900 | 756 |
| 3 | 25 | F2 – F3 | 2/1900 | 25 |
| 4 | 719 | E2 – E1 | 3/1900 | 719 |
| 5 | 759 | E2 – E1 | 9/1900 | 759 |
| 6 | 357 | F2 – F3 | 10/1900 | 357 |
| 7 | 683 | G3 – G4 | 9/1900 | 683 |
| 8 | 263 | E2 – E1 | 4/1900 | 1710 |
| 9 | 99 | E2 – E1 | 9/1900 | 99 |
| 10 | 542 | E2 – E1 | 10/1900 | 542 |
BO525 (8/1899). 2 domeless boilers for renewals.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 630 | G5 | 1/1900 | 630 |
| 2 | 502 | F7 | 12/1903 | 1756 |
BO526 (26/10/1899). 20 boilers for new Class D1 4-4-0 (EO221, issued same day).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1366 | D1 | 10/1900 | 1366 |
| 2 | 1367 | D1 | 10/1900 | 1367 |
| 3 | 1368 | D1 | 10/1900 | 1368 |
| 4 | 1369 | D1 | 10/1900 | 1369 |
| 5 | 1370 | D1 | 11/1900 | 1370 |
| 6 | 1371 | D1 | 11/1900 | 1371 |
| 7 | 1372 | D1 | 11/1900 | 1372 |
| 8 | 1373 | D1 | 11/1900 | 1373 |
| 9 | 1374 | D1 | 12/1900 | 1374 |
| 10 | 1375 | D1 | 12/1900 | 1375 |
| 11 | 1376 | D1 | 12/1900 | 1376 |
| 12 | 1377 | D1 | 1/1901 | 1377 |
| 13 | 1378 | D1 | 1/1901 | 1378 |
| 14 | 1379 | D1 | 1/1901 | 1379 |
| 15 | 1380 | D1 | 11/1900 | 1380 |
| 16 | 1381 | D1 | 1/1901 | 1381 |
| 17 | 1382 | D1 | 11/1900 | 1382 |
| 18 | 1383 | D1 | 12/1900 | 1383 |
| 19 | 1384 | D1 | 12/1900 | 1384 |
| 20 | 1385 | D1 | 12/1900 | 1385 |
BO527 (26/10/1899). 20 boilers for new Class J5 0-6-0 (EO220, issued same day).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 165 | J5 | 4/1900 | 165 |
| 2 | 177 | J5 | 5/1900 | 177 |
| 3 | 179 | J5 | 6/1900 | 179 |
| 4 | 180 | J5 | 5/1900 | 180 |
| 5 | 192 | J5 | 5/1900 | 192 |
| 6 | 302 | J5 | 5/1900 | 302 |
| 7 | 303 | J5 | 5/1900 | 303 |
| 8 | 304 | J5 | 6/1900 | 304 |
| 9 | 306 | J5 | 6/1900 | 306 |
| 10 | 308 | J5 | 7/1900 | 308 |
| 11 | 384 | J5 | 8/1900 | 384 |
| 12 | 386 | J5 | 7/1900 | 386 |
| 13 | 387 | J5 | 7/1900 | 387 |
| 14 | 388 | J5 | 8/1900 | 388 |
| 15 | 390 | J5 | 7/1900 | 390 |
| 16 | 392 | J5 | 8/1900 | 392 |
| 17 | 394 | J5 | 7/1900 | 394 |
| 18 | 396 | J5 | 6/1900 | 396 |
| 19 | 398 | J5 | 7/1900 | 398 |
| 20 | 399 | J5 | 8/1900 | 399 |
BO528 (6/4/1900). 10 boilers for new Class A5 4-2-2 (EO222, issued 1/8/1900). The boiler in No. 92 was afterwards allocated the number 1709 as the boiler in Class B1 2-2-2 No. 92A had already been allocated the number 92.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 92 | A5 | 6/1901 | 1709 |
| 2 | 100 | A5 | 6/1901 | 100 |
| 3 | 261 | A5 | 6/1901 | 261 |
| 4 | 262 | A5 | 6/1901 | 262 |
| 5 | 263 | A5 | 6/1901 | 263 |
| 6 | 264 | A5 | 6/1901 | 264 |
| 7 | 265 | A5 | 9/1901 | 265 |
| 8 | 268 | A5 | 10/1901 | 268 |
| 9 | 269 | A5 | 10/1901 | 269 |
| 10 | 270 | A5 | 10/1901 | 270 |
BO529 (6/4/1900). 10 boilers for new Class C2 4-4-2T (EO223, issued same day).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 1521 | C2 | 6/1901 | 1521 |
| 2 | 1522 | C2 | 6/1901 | 1522 |
| 3 | 1523 | C2 | 6/1901 | 1523 |
| 4 | 1524 | C2 | 10/1901 | 1524 |
| 5 | 1525 | C2 | 8/1901 | 1525 |
| 6 | 1526 | C2 | 9/1901 | 1526 |
| 7 | 1527 | C2 | 6/1901 | 1527 |
| 8 | 1528 | C2 | 11/1901 | 1528 |
| 9 | 1529 | C2 | 10/1901 | 1529 |
| 10 | 1530 | C2 | 11/1901 | 1530 |
BO530 (21/2/1901). 1 boiler for new Class C1 4-4-2 (EO224, issued 15 months earlier, 24/11/1899). The late ordering date is unexplained. It could be that Order numbers (BO, EO and TO) could be allocated in advance, with the actual order issue being delayed by last minute changes to the design holding up completion of the necessary drawings.
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 271 | C1 | 7/1902 | 1743 |
BO531 (6/4/1900). 1 boiler for new Class K1 0-8-0 (EO226, issued same day).
| Boiler No. | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|
| 1 | 401 | K1 | 2/1901 | 401 |
BO532 (20/6/1900). 20 boilers for renewals. At the time this retrospective order book was being compiled, this order was not quite completed. The allocations were mixed with many crossings out. Some of the numbers originally entered were Engine Repair Order numbers (ERO), which were then amended after tracking down which engine related to which ERO. Two other ERO’s entered were 730 and 731, against which the relevant engine numbers were not cross-referenced. However, the relationship to the progress Nos. in Column 1 may not be correct.
| Boiler No. | ERO No. in Boiler Book | Engine No. | Ivatt Class | Date | Final Boiler No. |
|---|---|---|---|---|---|
| 1 | 729 | 797 | J6 – J5 | 1/1901 | 797 |
| 2 | 714 | E2 – E1 | 3/1901 | 714 | |
| 3 | 183 | J6 – J5 | 2/1901 | 183 | |
| 4 | 147 | J6 – J5 | 3/1901 | 147 | |
| 5 | 754 | E2 – E1 | 3/1901 | 754 | |
| 6 | 727 | 661 | G3 – G4 | 3/1901 | 661 |
| 7 | 66 | F2 – F3 | 4/1901 | 1752 | |
| 8 | 64 | F2 – F3 | 4/1901 | 64 | |
| 9 | 107 | F2 – F3 | 4/1901 | 107 | |
| 10 | 862 | E2 – E1 | 5/1901 | 862 | |
| 11 | 102 | J6 – J5 | 6/1901 | 102 | |
| 12 | 90 | E2 – E1 | 6/1901 | 90 | |
| 13 | 749 | 793 | J6 – J5 | 7/1901 | 793 |
| 14 | 734 | 850 | J6 – J5 | 8/1901 | 1701 |
| 15 | 758 | 323 | J6 – J5 | 10/1901 | 1423 |
| 16 | 733 | 313 | J6 – J5 | 11/1901 | 1424 |
| 17 | 755 | 721 | J6 – J5 | 10/1901 | 1425 |
| 18 | 759 | 716 | J6 – J5 | 11/1901 | 1426 |
| 19 | 732 | 753 | E2 – E1 | 11/1901 | 1427 |
| 20 | 752 | 538 | F2 – F3 | 2/1902 | 1702 |
BO533 (24/7/1900). 6 vertical stationary boilers.
| Boiler No. | Location | Date | SB No. |
|---|---|---|---|
| 1 | Crimpsall Mess Room | /1902 | SB63 |
| 2 | Boston | /1902 | SB64 |
| 3 | Peterborough | /1902 | SB65 |
| 4 | Doncaster Bath & Office | /1903 | SB66 |
| 5 | Aslockton | 4/1903 | ?SB67 |
| 6 | Pinxton | 4/1903 | SB68 |
See Part 4 for later Boiler Orders