Part 20 – Gresley Engine Orders – GNR

The Maurice Boddy Collection

For details of Tender Orders see Part 26

Engine Order Date issued GNR Class Engine Nos. Renewal or Capital Remarks
269 26/1/1912 J21 71-80 R  
270 26/3/1912 H2 1630 R  
271 17/6/1912 J22 536-45 R  
272 8/8/1912 H2 1631-39 R  
273 30/10/1912 J22 546-65 R  
274 13/5/1913 O1 456-60 R  
275 13/2/2/1913 J22 566-75 R  
276 22/5/1913 J23 157-64/66/67 R Use old boilers
277 7/8/1913 H3 1640-49 not quoted from hereon Use boilers intended for K1-K2 conversions
278 16/12/1913 J22 576-85    
279 16/12/1913 J22 586-95    
280 15/4/1914 J23 168-76/78   Use old boilers
281 23/7/1914 H3 1650-59   Use boilers intended for 9 K1-K2
conversions, plus 1 extra
282 13/1/1915 J22 (596-605)

596-98

  Order cut from 10
to 3
283 8/12/1916 O2 461   Frames ordered 23/2/1916
284 11/1/1917 J22 599, 600    
285 15/6/1917 J22 601-10    
286

286A

21/2/1918 O1 462-71

472-76

  U.S. material

N.B. Loco. Co. material

287 13/6/1918 J22 621-30    
288 18/3/1919 O2 477-86   Ordered from N.B. Loco. Co. 4/1920
without tenders
289 3/10/1918 J23 211-20    
290 31/3/1919 H4 1000-09   “only two engines to be built for the present ” (6/6/1919)

amended to 10 (23/2/1920)

291 14/11/1919 J22 631-40    
(292) (30/12/1919) (J22) (641-50)   Order cancelled, after the frames had been cut.
Material eventually scrapped
292 3/1920 N2 1606-15   Replacement order
293 10/1/1921 A1 1470/71    
294 2/1920 N2 1721-70   N.B. Loco. Co. order
295 2/1920 H3 1680-99, 1700-04   Kitson order without tenders
296 5/12/1921 J23 221-30   “Latest type renewals fitted with
second hand boilers”
297 9/8/1922 A1 1472-81