Part 8 – Gresley Boiler Orders (1923-1941)

The Maurice Boddy Collection

BO Nos. shown in brackets, thus (671A) and (691), were for Orders not completed at Doncaster (either cancelled or transferred elsewhere such as Stratford).

Boiler Nos. in brackets, thus (7805/06), were not used for this specific order, but in most cases will appear again later in the list against a different or amended order.

ERO is Engine Repair Order

Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
7706-15 2 663 27/1/1923 EO298 Class O2 Nos. 487-86.

Instead 5 used for (part) EO298, and 5 used for EO299

7716-20 2 664 26/2/1923 EO299 Class O2 Nos. 3497-99, 3500/01.
Instead used as spares for Class O1
various 11   EO300 Class J50 Nos. 3231-40.
2nd-hand boilers: 6810, 1629, 6956/91/61, 7077/81/37, 1628/10
repaired to EROs: 2443/41/42/44/46/47/45/48/50/49.
7721-30 1 665 7/9/1923 8 shallow fireboxes; 2 deep fireboxes.
The first Dia 1 boilers ordered since May 1910
7731-35 4 666 7/9/1923 7731/32 fitted at Doncaster to Class C2 Nos. 3271, 3987
7733-35 sent to Darlington and fitted there to Class Q1 Nos. 3447/24/27
7736-45 7 Rob 667 7/9/1923 Superheater order cancelled, material to be taken from stock.
(7742 had Schmidt)
7746-50 7 Rob 668 7/9/1923 Superheater order cancelled, material to be taken from stock.
(7749 had Schmidt)
7751-58 7 NS 669 2/8/1923  
371-76 670 6/9/1923 Vertical boilers for stationary use
(7759/60) 8 NS (671A) 5/10/1923 For sale to M&GN.  No tubes/mountings.
Order transferred to BO682
(7761/62) 8 NS (671B) 5/10/1923 For sale to M&GN.  No tubes/mountings.
Order transferred to BO684. See next entry.
7761/62 8 NS 684 4/3/1924 For sale to M&GN.  No tubes/mountings.
Order transferred from BO671B.Boilers not sent to M&GN, but instead used in 4311/12
7763-72 94 672 12/10/1923 EO301 Class A1 Nos. 2543-52.
2543-44 had already taken boilers from BO662.
Boilers 7771/72 therefore used for 2553/54 of EO302
7773-82 94 673 12/10/1923 EO302 Class A1 Nos. 2553-62.
Instead boilers 7779/82 used for EO303
94 (674)   Order cancelled before material was ordered
7783/84 94 675 19/12/1923 Ordered as spares for Class A1 “to replace the two boilers of BO662
which are required for the Mikado engine”.
EO303 Class P1 Nos. 2393/94 had in fact taken two boilers from BO673.
7785-99, 7800-04 94   N.B. Loco. Co. Class A1 Nos. 2543-62
(7805/06) 96 (676) 10/4/1924 Built at Darlington. Tubes and mountings fitted at Doncaster.
Given Darlington series numbers.
(7807-16) 7 Rob (677) 10/4/1924 Built at Darlington. Tubes and mountings fitted at Doncaster.
Given Darlington series numbers.
3 boilers given Schmidt superheaters.
(7817-26) 7 Rob (678) 10/4/1924 Built at Darlington. Tubes and mountings fitted at Doncaster.
Given Darlington series numbers.
7805-14 8 NS 700 Second allocation of these numbers

 

Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
blank (8) (701)   Order cancelled and replaced by order for Dgm. 11 boilers
7815-24 11 701 1/3/1926 Originally BO702. Second allocation of these numbers
7825/26

7972-79

1 702 1/3/1926 Originally BO703. Second allocation of these numbers followed
by next 8 available numbers
7827-31 1 679 5/3/1924 Order amended 14/8/1924, to have shallow fireboxes
7832-36 4 Rob 680 4/3/1924 Superheater order cancelled, material to be taken from stock.
(7832/34 had Schmidt instead)
7837-40, 7942 3 681 4/3/1924  
7841-50,
7876/77
8 NS 682 4/3/1924 (10) spares
2 more added, transferred from BO671A and given numbers 7876/77.
But 7843/77 sold to M&GN
7851-60 8 NS 683 4/3/1924  
7861-65 1 685 24/7/1924  
7866-75 8 NS 686 24/7/1924  
7876/77       See BO682 above
7878/79 94 689 19/3/1925 Noted as being for “for renewals of Pacific engines”.
7880-84 690 19/3/1925  
7885-94 9 NS (691) Built at Stratford, fitted at Doncaster
7895-99, 7900-04 9 NS (692) Built at Stratford, fitted at Doncaster
(7905-12) 7 NS (693) Built at Darlington.  Given Darlington series numbers
(7913-22) 8 NS (694) 26/2/1925 Built at Darlington.  Given Darlington series numbers
7923-32 11 695 EO306 Class J50 Nos. 583/86/88/91/89/93/94, 601/03, 596. These
were the first 1-ring barrels of this type, which therefore tapered slightly.
7933-41 11  696 29/8/1925 EO307 Class J50 Nos. 609/16/10/17/18/21/22/35/36.
(7942-45) 97   Altered to 8772-75, see later
7942       See BO681 earlier
7943-52 11 697 20/2/1926 EO308 Class J50 Nos. 1037/41/58/45/63/68-70/74/79.
7953-62 73 687 5/12/1924 EO304 Class J72 Nos. 500/12/16/24/42/66/71/76/81/74
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
1380-85 7 TT 688 11/12/1924 EO305 Class N7 Nos. 892-97
(7963/64)

7964

95     2 boilers ordered from Beyer Peacock for Class U1.

Only one boiler made (for No. 2395)

7965-67 11 698 20/2/1926 EO309 Class J50 Nos. 1086/81/82
7968/69 11 699A 22/1/1926 For M&GN, no tube and mountings. Sold 7/1926
7970/71 8 699B 22/1/1926 For M&GN, no tube and mountings. Sold 7/1926
7972-79 1 702 1/3/1926 Originally BO703 (see earlier)
7980-89 9 703 1/3/1926 Originally BO704.  The first Dia 9 boilers with 1-ring barrels,
which tapered slightly
7990-92 96 704 1/3/1926 Originally BO705
7993-99, 8000-02 7 NS 705 1/3/1926 Originally BO706
G685 23 (706) 26/2/1925 Built at Gorton, fitted to Class J60 No. 6411 at Tuxford Shops
2055-64 101 707 21/5/1926 EO310 Class N7 Nos. 2600-09
2065-73 101 708 21/5/1926 EO311 Class N7 Nos. 2610-18
2074-83 101 709 21/8/1926 EO312 Class N7 Nos. 2619/21/20/24/22/23/25-28
2084-86 101 710 21/8/1926 EO313 Class N7 Nos. 2629-31
8003-26 97     New Class J39 from Armstrong Whitworth.
Some boilers built at Darlington instead
8027/28 94HP 711A 11/3/1927 For conversions of Nos. 44480, 2544 to Class A3 at Doncaster
8029-31 94HP 711B 11/3/1927 For conversions of Nos. 2580/73/78 to Class A3 at Darlington
8032-41 1 712 11/3/1927  
8042-46 1 713 11/3/1927  
8047-51 4 714 1/3/1927  
8052-61 8 715 11/3/1927  
8062-69 11 716 11/3/1927  
8070-72 96 717A 11/3/1927 Fitted at Doncaster
8073/74 96 717B 11/3/1927 Fitted at Darlington
8075-81 94HP 718A 3/8/1927 EO314A Class A3 Nos. 2743-49
8082-84 94HP 718B 3/8/1927 EO314B Class A3 Nos. 2751/50/52
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
8085-89 4 719 9/9/1927  
8090-99,

8100-09

7     New Class N2 from H. Leslie, Nos. 2662-81
8110-19 96 720 3/8/1927 EO315 Class K3 intended Nos. 1300/12/18/31/45/64/65/67/68/86
actually fitted Nos. 1300/12/31/18/45/64/65/67/86/68
8120-29 96 727 3/8/1927 EO316 Class K3 Nos. 1387-89/91/92/94-98
(8130-32) 7 Sup     Superheated boilers from H. Leslie, but not stated which type.
Order cancelled
8133-41 7 TT     New Class N2 from Yorks. Eng. Co., Nos. 2682-90
8142-51 11 (728)   Built by Kitson
8152-61 11 (729)   Built by Kitson
8162-71 11 (730)   Built by Kitson
8172-76 4 (721) 25/2/1928 Built at Gorton, fitted at Doncaster
8177-81 8 (722) 25/2/1928 Built at Gorton, fitted at Doncaster
G981/82,

8182-86

2 (723) 25/3/1928 7 boilers built at Gorton, first 2 for Class O4 conversions.

Last 5 sent to Doncaster for spares, of which 8183 was fitted
instead to new Class O2 No. 2430 (see BO782 later)

8187-96 7 NS (724) 25/2/1928 Built at Cowlairs, fitted at Doncaster
8197-99, 8200-06 9 (725) 25/2/1928 Built at Cowlairs, fitted at Doncaster
8207-16 9 (726) 25/2/1928 Built at Cowlairs, fitted at Doncaster
8217-19 10 (734)   Built at Gorton. Fitted to Class N6 Nos. 6155/58/62
8220-22 5 (735)   Built at Gorton. One of these fitted to Class M1 No. 6146
8223-26 94HP 731 25/2/1928 Intended as spares.
Used for new Class A3 Nos. 2595-97, 2795 of EO317 instead
8227-31 4 732 25/2/1928  
8232-41 1 733 25/2/1928  
8242-44     Possibly allocated to boilers in Clayton railcars Nos. 42-44
8245/46     Possibly allocated to boilers in Sentinel railcars Nos. 12E, 13E
The Yeadon Registers should throw more light on Boilers 8242-46
8247-54 94HP 736 18/12/1928 EO317 Class A3 Nos. 2595-99, 2795-97.

Instead first 4 were used for Nos. 2796/97, 2598/99,
and last 4 were used as spares

8255-64 9 737 18/12/1928  
8265-70 11 738 18/12/1928 EO381 Class J50 Nos. 2789-94
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
8271-80 7 Rob (739) 25/2/1929 Boilers built at Cowlairs, fitted at Doncaster
8281-85 7 TT (740) 25/2/1929 Boilers built at Cowlairs.
 8281 fitted at Stratford, remainder at Doncaster 
8286-90 1 741 4/2/1929  
8291-95 8 742 4/3/1929  
8296-99, 8300/81-85 1 753 25/11/1929  
8301-10 11 743 4/3/1929  
8311-20 11 744 4/3/1929  
(8321-27)

 8321-24,

8325-27

(11)

9

11

745 4/3/1929

 Order then amended to:

(4) spares

(3) spares

D2182/84/86/88/89/91 97 (746) 8/4/1929 To be built at Darlington. Transferred to Gorton 1930
for “A201/05” (Class J39), possibly spares
8328-37 7 NS (747) 29/5/1929 Built at Cowlairs, fitted at Doncaster
8338-47 9 (748) 29/3/1929 Built at Cowlairs, fitted at Doncaster
8348-52 9 (749) 29/5/1929 Built at Cowlairs, fitted at Doncaster
8353-62 102 750 19/11/1929 EO319 new Class V1 Nos. 2900-09
8363-72 102 751 19/11/1929 EO320 new Class V1 Nos. 2910-19
8373-80 102 752 19/11/1929 EO321 new Class V1 Nos. 2920-27
8381-85 1     See BO753 earlier
8386-95 7 NS (754) 9/12/1929 Built at Cowlairs, fitted at Doncaster
8396-99, 8400-05 7 Rob (755) 9/12/1929 Built at Cowlairs, fitted at Doncaster
8406-10 756 28/2/1930   
8411-20 7 NS 757 10/3/1930  
8421-30 9 758 10/2/1930  
8431-40 9 759 10/2/1930  
8441-50 11 760 10/2/1930  
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
8451-55 8 761 10/2/1930  
(8464-65)

8456-63

2 (762) 6/12/1929 EO326 Class O2 Nos. 2954-63. Boilers to be built at Gorton.

Order reduced to 8 (Nos. 2954-61)

(8466-70) 2 (763) 6/12/1929 EO326 Class O2 Nos. 2964-68. Boilers to be built at Gorton.
Entire order cancelled
8464-65 105 (763) 29/7/1930 BO763 reissued.
EO325 Class S1 Nos. 2798-99. Boilers built at Gorton
8466-70 7 NS 775 3/2/1931  
8471-80 9 764 14/5/1930  
8481-90 11 765 14/5/1930  
8491-99, 8500 9 766 14/5/1930  
8501-06     Galloways boilers for
Class Y3 Nos. 18, 21, 23, 49, 55, 94, built by Sentinel
8507     Galloways boiler for railcar 51909 Waterloo
8508-17 11 767 8/2/1931  
8518-22 9 768 3/2/1931  
8523-27 8 769 3/2/1931  
8328-37 7 NS 770 3/2/1931  
8538-47 7 Rob 771 3/2/1931  
8548-57 11 772 3/2/1931  
8558-62 3 773 3/2/1931 Possibly not built at Doncaster.
Only fittings seem to have been ordered here
8563-67 7 Rob 774 3/2/1931 8565 sent to Cowlairs
(8568)       Not allocated or used
8569-72/74 1 776 1/7/1931  
8573     Galloways boiler for railcar 45 Commerce
8575-79 8 777 7/9/1931  
8580-94 97     New Class J39 from Robt. Stephenson, Nos. 2962-76
8595-99, 8600-06 96     New Class K3 from Armstrong Whitworth,
Nos. 1121/25/33/35/37/41/54/56/58/62/64/66
102 (778) 28/1/1932 EO322 Class V1 Nos. 2928-37. Cancelled 27/6/1932
102 (779) 28/4/1932 EO323 Class V1 Nos. 2938-47. Cancelled 27/6/1932
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
8607-12 102 780 28/4/1932 EO324 Class V1 Nos. 2948-53. Amended 6/1932 to be 2928-33.

But 8607/08 sent as spares to Cowlairs.
8609-12 used for Nos. 2928-31.
(See BO804 later for boilers for new Nos. 2932/33)

(8613-16)       Possibly BO780 (previous entry) had been for 10 boilers at one time
(possibly

8617-21)

94HP (781) 28/4/1932 EO327 Class A3 (5 engines).  Cancelled 2/3/1933
(8622-29)

4401-08

2 782 23/2/1932 EO328 Class O2 intended Nos. 2430-37, built at Gorton.

 Boiler numbers amended
Actually fitted to (7) new Nos. 2437/36/35/34/32/31/33
and (1) renewal No. 3491
See BO723 earlier for the boiler for new No. 2430

(8630-39) 102 (783) 23/4/1932 EO329 Class P10 to be built at Gorton.  Order cancelled 6/1932
8640-49 8 784 3/3/1932  
8650-59 9 785 3/3/1932  
8660-69 1 786 3/3/1932  
8670-79 11 787 3/3/1932  
8680-84 8 788 3/3/1932 8681/84 sent to M&GN
8685-89 11 789 3/3/1932  
8690-99 7 Rob 790 3/3/1932 8692 sent to Cowlairs, and renumbered C1534 
8700-09 7 NS 791 3/3/1932  
8710-19 7 Rob 792 3/3/1932  
8720-21 94HP 793 24/2/1933  
8722-26 1 794 25/2/1933  
8727-36 7 NS 795 22/2/1933  
8737-41 96 796 22/2/1933   
8742-51 9 797 22/2/1933  
8752-55 3 798 22/2/1933 Sent to Cowlairs for fitting
8756-60 3 799 22/2/1933  
8761-70 11 800 22/1933  
(8771/72)

8771

106 801 1/3/1933 EO330 Class P2 Nos. 2981/82, later 2001/02.

Order reduced 1/4/1933 to 1 (for No. 2001)

8772-75 97     Built at Cowlairs. Originally intended as 7942-45, see earlier
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
8776-84 94A 802 4/11/1933 EO331 Class A3 Nos. 2500-08
8785 106 803 4/11/1933 EO332 Class P2 No. 2982, later 2002.
8786-95 102 804 4/11/1933 EO333 Class V1 Nos. 417/46/77/79/81/84/86/87/97/98.
First 2 boilers used for Nos. 2932/33 of EO324,
leaving a shortage for Nos. 497/98
8796-99 106 805 4/11/1933 EO334 Class P2 Nos. 2003-06. 8796/98/99 used for Nos. 2003-05,
leaving 8797 spare (first used in 1940).
2006 received the boiler from BO823
(8800-03)       Not identified
8804-13 7 Rob 806 14/3/1934 8810 sent to Cowlairs
8814-18 7 Rob 807 14/3/1934  
8819-22 2 808 27/2/1934  
8823-27 3 809 27/2/1934  
8828-37 7 Rob 810 27/2/1934  
8838/39 102 811 22/6/1934 EO333 Class V1 Nos. 497/98 (see BO804 earlier note)
8840-44 3 812 2/11/1934 8842 sent to Cowlairs
8845-54 102 813 6/3/1935 EO335 Class V1 intended Nos. 402/14-16/18/19/22/23/28/40
actually fitted Nos.402/14-16/18, 2897, 419/22/23/28
8855-59 2 814 2/3/1935  
8860-69 3 815 2/3/1935  
8870-74 96 816 2/3/1935 8870/71 sent to Darlington
8875-84 7 NS 817 2/3/1935  
8885/86 96 818 2/3/1935  
(8887-96) 102 (819) 6/3/1935 EO336 Class V1 Nos. 454/55/61/65-67/72/78/80/83. Order cancelled
8897-99, 8900-04 102 820 6/3/1935 EO337 Class V1 intended Nos. 485/88-91, 2897-99
actually fitted Nos.440, 2898, 454/55/61/65/66, 2899
8905-08 107 821 11/3/1935 EO338 Class A4 Nos. 2509-12
8909-28 96     New Class K3, from N.B. Loco. Co., Nos. 2425 etc.
8929-33 109 822 28/5/1935 EO339 Class V2 Nos. 637/39/40/64/70, amended to 4771-75
8934 108 823 3/7/1935 EO334 Class P2 No. 2006
8935-44 7 Rob 824 29/10/1935  
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
8945-54 107 825 30/12/1935 EO340 Class A4 Nos. 2063/77, 2515/16/19/20, 2031/36/39/49.
Amended to 4482-91.
8955-61 107 826 30/12/1935 EO341 Class A4 Nos. 2052/64, 2111-15. Amended to 4492-98.
8962-71 96     New Class K3 from Armstrong Whitworth
Nos. 2417/29/45/46/53/55/58/65/71/72
8972-76 2 827 24/2/1936  
8977-82 3 828 24/2/1936 8977 sent to Cowlairs
8983-92 7 Rob 829 24/2/1936  
8993-97 7 TT 830 24/2/1936  
8998/99, 9000-07 7 NS 831 24/2/1936  
9008-11 3 832 24/2/1936  
9012-16  2 833 24/2/1936   
9017 111 834 26/1/1937 Class W1 No. 10000 rebuilt
9018-20 107 826A 3/11/1936 EO341A Class A4 Nos. 4462-64
9021-30 107 835 3/11/1936 EO342 Class A4 Nos. 4465-69, 4500, 4900-02
9031 107 836 3/11/1936 EO343 Class A4 No. 4903
9032-41 102 837 3/11/1936 EO344 Class V1 Nos. 404/07/20/24/25/47/48/51/67/69.
9042-51 102 838 3/11/1936 EO345 Class V1 Nos. 472/78/80/83/85/88-91/96.
9052-61 7 Rob 839 17/2/1937  
9062-66 7 TT 840 17/2/1937  
9067-71 7 Rob 841 17/2/1937  
9072-76 3 842 17/2/1937 9072 sent to Cowlairs
(9077/98) 109     Order transferred to Darlington,
and their boiler series numbers were used
9099, 9100-6 11     Class J50 Nos. 599, 600/02/05/06/08/11/15, built at Gorton
9107-12 11     Class J50 Nos. 584/85/87/90/95/98, built at Gorton
9113/14 8     M&GN Nos. 88 and 83 taken over.
Boilers were previously Nos. 8681/84
Boiler Nos. Blr. Dgm. BO Date Allocations and remarks
9115-24 94A 843 14/1/1938  
9125-29 107 844 14/1/1938  
9130-39 7 Rob 845 3/3/1938 9133/36 sent to Cowlairs
9140-49 7 TT 846 4/3/1938  
9150-54 3 847 4/3/1938 9153/54 sent to Cowlairs
9155-59 9 848 4/3/1938  
9160-64 2 849 4/3/1938  
9165-74 109 850 25/7/1938 EO346 Class V2 Nos. 4843-52.
9175-79 7 TT 851 15/11/1938  
3651-55 15A 852 29/11/1938 Sent to Gorton for conversions to O4/5
9180-89 102 853 16/12/1938 EO347 Class V1 Nos. 390-93, 395-99, 401.
Corrected to be Class V3 1/1939
9190/91 109 854 6/1/1939 (2) Class V2 renewals but
9191 instead fitted to new No. 3655 (see BO862 below)
9192-96 3 855 17/1/1939  
9197-99, 9200/01 3 856 12/4/1939  
9202-06 7 NS 857 12/4/1939  
9207-16 94A 858 12/4/1939  
9217-21 102 859 10/5/1939 9217/18 sent to Darlington
9222-26 7 TT 860 23/9/1939  
(9227/28)

9227

112 861 17/10/1939 EO355 Class V4 Nos. 3401/02.

Second boiler cancelled, see BO871

9228 113 871 6/1940 EO355 Class V4 No. 3402
9229-38 109 862 29/12/1939 EO356 Class V2 intended Nos. 3655-64
Actually fitted (9) new Nos. 3656/57/59/58/61/60/62-64
and (1) renewal for No. 4771
9239-48 2 863 29/12/1939  
9249-53 11 864 29/12/1939  
9254-63 7 Rob 865 29/12/1939  

 

Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
9264-68 7 TT 866 29/12/1939  
9269-78 7 NS 867 29/12/1939  
9279-88 96 868 29/12/1939  
9289-98 109 (869) 1/1940 EO357 Class V2 Nos. 3665-74.
Order transferred to Darlington 9/6/1941
3415-24 15     Gorton BCO2025.
Boilers assembled at Doncaster without tubes and mountings.
Sent to Gorton for completion (1940-41). For Class O4
(9299, 9300-03) 102 (870) -/1940 EO358 Class V3 Nos. 386/88/89, 453/58.
Order cancelled 2/2/1943
9304-13 11     Boilers built at Gorton for EO360 Class J50.
EO360 put in abeyance 1/1942, cancelled 6/1942.
Boilers used instead as spares
9314-23 2 872 3/6/1940 EO359 Class O2 Nos. 3833-42
109 (873)   EO361 Class V2 Nos. 3675-84 ordered 4/1941.
Order transferred to Darlington 9/6/1941
109 (874)   EO362 Class V2 Nos. 3685-94 ordered 4/1941.
Order transferred to Darlington 9/6/1941
109 (875)   EO363 Class V2 Nos. 3695-99 ordered 4/1941.
Order transferred to Darlington 9/6/1941
9324-33 7 TT (876) 4/6/1941  
9334-43 7 Rob 877 4/6/1941  
9344-50 3 878 4/6/1941 9344/45/47-50 sent to Cowlairs
9351-55 7 NS 879 4/6/1941  
9356-60 1 880 4/6/1941  
9361-66 2 881 4/6/1941  
9367-71 109 (882) 4/6/1941 Order transferred to Darlington 1/10/1942
9372-84 96 883 4/6/1941 9372/73/76 sent to Cowlairs
9385-94 2 884 9/6/1941 EO364 Class O2 Nos. 3843-52.
Entire order transferred from Darlington
9395-99 2 885 9/6/1941 EO365 Class O2 Nos. 3853-57.
Entire order transferred from Darlington
Boiler Nos. Blr. Dgm. BO Date Allocation and remarks
(9400-09) 102 (886) 7/7/1941 EO366 Class V3 for Southern Area. EO366 cancelled 1/1943.
BO866 cancelled 2/2/1943
102 (887) 7/7/1941 EO367 (10) Class V3. In abeyance 1/1942
11 (888) 7/7/1941 EO368 (10) Class J50 for N.E. Area. In abeyance 7/1/1942, cancelled 4/1942
11 (889) 7/7/1941 EO359 (5) Class J50 for Southern Area, In abeyance 7/1/1942, cancelled 4/1942
9410-24 25A 890 29/7/1941 9410/11/19/24 sent to Cowlairs. 9412-18/20-23 sent to Stratford
9425-36 100A 891 3/10/1941 .

BO891 (3/10/1941) was for new design Dgm. 100A boilers, signalling the emergence of the Thompson era, see

 PART 9.